KNRConstructionsSend Plans

Multi-Family Estimating Services for Contractors

KNR Constructions provides multi-family estimating services to general contractors, trade contractors, owners and developers across the U.S., pricing apartments, mixed-use buildings and parking structures from your drawings. We deliver an Excel workbook and PDF summary with marked-up drawing pages, so your team can see every quantity, unit of measure and unit price before the bid goes out.

  • Apartment, mixed-use and parking structure takeoffs
  • Every quantity tied to a unit of measure
  • Wage and material data cited on the sheet
  • Excel workbook, PDF summary, marked drawings

Upload your plans

Send drawings and a short scope. You get a fixed price before any work starts.

What do multi-family estimating services include?

Multi-family estimating services turn architectural, structural and MEP drawings into measured quantities and priced line items by CSI MasterFormat division. We show the unit of measure, waste factor and arithmetic for each line, then deliver an Excel workbook, PDF summary and marked-up drawing pages.

Our Professional Multi-Family Estimating Services

A multi-family estimate is only useful if a reviewer can follow every number back to a drawing and a rule. We measure each building from the construction documents, tag every quantity with its CSI MasterFormat division, and show the unit of measure and the calculation behind it. The workbook and PDF summary we return carry marked-up drawing pages so your project manager can check a wall assembly or a fixture count against the sheet it came from.

We work across the full building, not one trade. That matters on garden-style and podium apartments, where the concrete, framing, and finishes quantities interact. Our multi-family estimating services run from a schematic design estimate at 30% drawings to a bid-level takeoff at 100% CDs, and the same adu construction cost estimates support we apply to accessory units on a site carries over to detached garage and clubhouse structures.

Material quantities by trade unit

We measure materials by the unit each trade buys in: cubic yards of cast-in-place concrete, board feet and sheets of wood sheathing, square feet of gypsum board by thickness and type, squares of roofing, and tons of structural steel. Waste factors are applied per material and labeled as typical ranges, so you can see where a 5% allowance on lumber differs from a 10% allowance on tile. The deliverable is a line-item material list keyed to drawing sheet numbers and CSI division, and it is the backbone of our multi-family takeoff services.

Crew-based labor pricing

Labor is priced by crew and by production rate, not by a single blended rate. We show hours per unit of measure for each line, then apply the current published wage for the trade. That means carpenters, electricians, plumbers, cement masons, and first-line supervisors each carry their own rate rather than a project-wide average. Overtime, shift work, and prevailing wage requirements are flagged separately so you can see their effect on the subtotal.

Trade-organized bid packages

For a bid package, we organize the estimate by trade scope so each subcontractor's portion can be pulled out and compared. Alternates and allowances are listed as separate line items with their basis stated, and general conditions are broken into supervision, temporary facilities, and equipment. Every line carries its source drawing, unit, quantity, unit cost, and extended amount, and the arithmetic is checked before the workbook is sent. This is the format our multi-family estimating services deliver for apartment building cost estimates that go out to bid.

What Is Included in Our Multi-Family Estimates?

An apartment building cost estimate is really a stack of assemblies, and we build it that way. Each assembly is priced from its components rather than from a square-foot multiplier, so a change to one material does not silently move the whole budget. Our multi-family estimating services cover the full scope from site work through Division 16 electrical, with the quantities and assumptions visible on the page. The same line-item method carries over to our residential estimating services when a project mixes rental units with for-sale housing, and it applies equally to adu construction cost estimating on infill lots where a detached unit shares utilities with the main building.

Site work, structure, envelope and interior systems

We take off site work, then Division 03 concrete for footings, slabs-on-grade, podium decks, and cast-in-place walls. Above that come wood or light-gauge steel framing, sheathing, roofing, windows and doors, and Division 09 finishes including gypsum board, flooring, and paint. Mechanical, electrical, and plumbing are taken from the schedules and fixture counts, and fire-rated assemblies are identified by their UL design number where the drawings show one.

Quantities, units of measure and drawing references

Each line states the quantity, the unit of measure, and the drawing or schedule it came from. Typical lines include cubic yards of concrete, square feet of form contact area, pounds of rebar, square feet of wall area by assembly type, plumbing fixture counts by type, and linear feet of pipe by diameter. Door, window, and finish schedules are reconciled against the plan count before the takeoff is closed out.

Materials, labor, equipment and cost breakdowns

The workbook separates the three cost components on every line so you can adjust one without disturbing the others.

  • Material: quantity times unit price, with waste shown as its own row.
  • Labor: crew hours times the published wage for the trade, with burden stated separately.
  • Equipment: cranes, pumps, lifts, and small tools priced by duration or by rental period.
  • Subtotal and markup: extended cost, general conditions, and contingency shown as distinct rows.

Costs are built from national average unit costs, adjusted with published U.S. wage and price data, then reviewed by an estimator before the file is released.

Who Needs Our Multi-Family Estimating Services?

Different readers use the same takeoff for different decisions, so we format the output to serve all of them. A framing subcontractor wants board feet and sheet counts; a developer wants a budget range by building. Our multi-family quantity takeoff keeps the detail at the line-item level so both can work from one file, and that is the reason we run multi-family estimating services as a single scope rather than a set of trade packages.

Framing, drywall and finishes subcontractors

Trade contractors bidding a portion of a building use the takeoff to price their scope without measuring the whole set. A drywall contractor gets wall area by assembly type, board counts by thickness, and Division 09 finishes separated from structure. Fire-rated assemblies are called out by rating so the correct board and framing detail is priced, and the bid package scope is matched line for line.

General contractors and home builders

A general contractor uses the estimate to check subcontractor bids against an independent quantity, and to see which trade is carrying the most risk. Builders moving from single-family work into duplexes and small apartment buildings use it to understand how the cost structure changes with shared walls, common areas, and elevators, which is where multi-family estimating services differ most from a house takeoff.

Developers, architects and suppliers

Developers use the budget estimate to test a pro forma before committing to design fees. Architects use the line items to see which assemblies drive cost during design revisions. Suppliers use the material quantities to plan deliveries and staging across a multi-building site.

Types of Multi-Family Projects We Estimate

Scope changes with building type, and so does the takeoff. Our multi-family estimating services are organized around the project type so the estimate reflects the systems that actually appear on the drawings.

Residential projects

Garden-style apartments, townhomes, and mid-rise residential buildings are measured by dwelling unit and by gross floor area, with common areas separated from rentable square footage. Unit types are taken off once and multiplied, with a check that the unit mix on the plan matches the schedule. Division 15 mechanical scope grows with the number of units and the type of heating and cooling system. Alternates such as upgraded finishes or added balconies are priced as separate line items. For the single-family and smaller residential side, see our residential estimating services and apartment estimating services.

Commercial buildings

Mixed-use buildings with ground-floor retail, parking structures, and amenity spaces carry scope that residential-only takeoffs miss. We separate tenant improvement allowances from base building work and price the parking structure and elevator as distinct scopes. Where a project converts or renovates existing stock, our remodeling and renovation estimating follows the same line-item discipline, and multi-family estimating services cover the base building scope alongside it.

Industrial and infrastructure projects

Support buildings, maintenance facilities, and site infrastructure on a campus are measured with the same discipline but different assemblies. Site utilities, paving, and structural steel quantities take a larger share of the estimate than finishes do.

Our Multi-Family Estimating Process

We run every apartment job through the same three stages, and each stage produces a file you can audit. The sequence matters because an apartment construction takeoff that starts before the plan review is complete will miss the addenda that change Division 16 electrical panels or shift Division 03 concrete slab thicknesses. Send drawings, specifications and any issued addenda together so the takeoff reflects one document set. Our multi-family estimating services follow this same path on every building type, from garden-style walk-ups to podium towers, so the apartment estimates you receive carry the same audit trail, and the same method carries into remodeling and renovation estimates when a unit turns over or a common area is rebuilt.

  1. Submit drawings and specifications

    We need the full set: architectural, structural, mechanical, electrical and plumbing sheets, plus the project manual and schedules (door, window, finish, mechanical and panel). Tell us the gross floor area, the dwelling unit mix and whether a parking structure or podium is in scope. If the bid package carries alternates or allowances, flag them at intake so they are priced as separate line items rather than folded into the base. Use the request a quote form to start the file.

  2. Plan review and digital takeoff

    An estimator reads the set sheet by sheet and sets a measurement rule before measuring anything: slab on grade to the inside face of foundation walls, gypsum board to the finished face, roofing to the eave line. Quantities are taken on-screen from the PDF with each area, count and linear measurement tagged to its sheet number. Cross-checks follow — plumbing fixture count against the plumbing sheets, panel schedule against the one-line diagram, unit count against the floor plans.

  3. Cost calculation, quality checks and delivery

    Quantities are multiplied by unit costs adjusted for your location and labor conditions, then a second estimator reviews the workbook for unit-of-measure errors and missing scope. The review confirms that waste factors are applied only to materials that need them and that general conditions match the schedule. You receive the Excel workbook, a PDF summary and marked-up drawing pages showing where each quantity came from.

Sample Multi-Family Estimate and Deliverables

The example below is illustrative and shows how a multi-family budget estimate is built from a takeoff, not how your project will price. Assumptions: a four-story, 48-unit wood-framed apartment building over a cast-in-place podium, 52,000 gross square feet, unit costs drawn from national averages and adjusted for location. General conditions are carried as a separate line so the owner can see overhead and supervision apart from trade work. The table is the core of the deliverable; the H3s below describe the three files that accompany it.

Illustrative takeoff and cost summary lines for a 48-unit, 52,000 GSF wood-framed apartment building over a cast-in-place podium (illustrative figures; arithmetic shown)
CSI division / line itemQuantityUnit of measureMeasurement ruleUnit cost (illustrative)Extended cost (illustrative)
Division 03 — cast-in-place podium slab and walls1,850cubic yardsPodium footprint times slab thickness plus wall lengths times thickness, no deduction for openings under 10 SF$310.00$573,500.00
Division 06 — wood framing, floor and roof52,000gross square feetGross floor area from exterior face of wall, all floors including podium level$14.50$754,000.00
Division 09 — gypsum board, tape and finish118,000square feet of boardWall and ceiling area by unit type from finish schedule, 10% typical waste added$2.35$277,300.00
Division 09 — interior paint118,000square feet of surfaceSame surface area as gypsum board, no waste added$1.10$129,800.00
Division 15 — plumbing fixtures192fixturesPlumbing fixture count from fixture schedule: 4 per dwelling unit$640.00$122,880.00
Division 16 — branch wiring and devices48dwelling unitsPanel schedule and device count per unit type, riser excluded$3,900.00$187,200.00
Division 14 — elevator2stops-served unitsTwo elevators, four stops each, priced per stop from manufacturer data$46,000.00$368,000.00
Division 21 — fire sprinkler52,000gross square feetGross floor area including parking and common areas$3.40$176,800.00
General conditions — supervision and temporary facilities6monthsProject duration from schedule, first-line supervisor wage basis$28,500.00$171,000.00
  • Excel quantity takeoff sheet

    Every row carries an item description, a quantity, a unit of measure, the measurement rule used and the sheet reference. Division 09 finishes are broken out by dwelling unit type so the owner can compare a one-bedroom against a two-bedroom without re-measuring. Formulas stay live so your team can change a waste factor or a unit cost and watch the total move.

  • Marked-up drawings

    We return the plan pages with color-coded overlays for each trade: concrete and framing in one pass, gypsum board and roofing in another, mechanical and electrical counts in a third. Each overlay is keyed to the workbook row numbers, so a reviewer can trace a line item back to the exact wall or fixture on the drawing.

  • Itemized cost estimate

    The PDF summary groups costs by CSI MasterFormat division and separates general conditions, allowances and alternates from the base bid. Rentable square footage and gross floor area are both shown so the owner can read cost per rentable foot as well as cost per gross foot. Our quantity takeoff services page explains how the underlying measurements are produced.

Software and Pricing Data We Use

Every number in the workbook comes from a named source, and the pricing layer is refreshed as public data changes. The chart below tracks the Producer Price Index series for the materials that dominate this scope, rebased to 100 so you can see relative movement rather than absolute dollars. The wage table below carries the BLS occupational wages we start from before location adjustment. The same pricing method carries across building types, which is why the custom home estimates we produce for single-lot work use the identical wage and index basis as a 200-unit apartment building cost estimate.

Takeoff and estimating software

We work in three tool categories: PDF and on-screen takeoff for measuring and marking up drawings, spreadsheet estimating for the line-item build-up, and subscription cost databases for baseline unit costs. Each takeoff measurement is stored with its sheet reference and unit of measure, so a cost line can be traced back to the drawing it came from. A multi-family bid estimate built this way survives an owner review because nothing is entered twice by hand.

Regional material and labor pricing method

We start from national average unit costs, adjust labor with BLS wage data for the trade and the metro, and adjust materials with the Producer Price Index movement shown in the chart below. Site work, parking structure and elevator costs get separate treatment because their labor content and lead times differ from the building trades. Prevailing wage projects use the applicable wage determination instead of the national median, and the workbook states which basis was used.

Material price movement, Oct 2023 to Sep 2026

85118150Oct 2023Sep 2026
Lumber and wood products: +14.6%Ready-mix concrete: +6.3%Steel mill products: +27.8%Copper wire and cable: +47.5%
Index rebased to 100 at Oct 2023. Source: U.S. Bureau of Labor Statistics, Producer Price Index (WPU081, WPU1333, WPU1017, WPU102502), updated 2026-10-25.
U.S. hourly wages for the trades in this scope (latest BLS release)
Occupation25th percentileMedian75th percentile
Construction laborers$18.57$22.66$28.72
Carpenters$23.32$29.12$36.94
Electricians$23.76$30.38$40.36
Plumbers, pipefitters and steamfitters$24.13$30.67$40.92
Cement masons and concrete finishers$22.60$27.41$32.15
First-line supervisors, construction trades$30.48$38.42$48.78
Cost estimators$29.40$37.86$48.97

Base wages before payroll taxes, insurance and benefits. Source: BLS Occupational Employment and Wage Statistics, national, all industries.

Why Contractors Choose Our Estimating Services

Method is the reason: every line item shows its unit, its measurement rule and its source, so a reviewer can challenge any number and see the arithmetic. That traceability is what separates multifamily cost estimating from a lump-sum guess, and it is what lets a general contractor defend a bid package in a leveling meeting. Teams that also carry professional single family estimating work get the same line-item discipline on scattered-lot plans.

Trade-specific expertise

Cast-in-place concrete is measured to the form contact area or by volume depending on the element, and post-tensioned slabs are priced with their strand and anchorage separately. Wood and light-gauge steel framing are taken off by member type and spacing, not by square foot alone. Finishes carry a stated waste factor by material — typical ranges run higher for tile and flooring than for gypsum board — and elevator, fire sprinkler and mechanical scope are priced from the schedules rather than a percentage.

Quality control and clear assumptions

Each workbook opens with an assumptions page: code edition, drawing date, addenda included, exclusions and the basis for every allowance. A second estimator checks unit-of-measure conversions and confirms that counts match the schedules before the file leaves. Where a detail is unresolved, the line is flagged rather than filled with a silent number.

Turnaround, communication and revisions

We agree the delivery date when we accept the job, based on the sheet count, the number of unit types and how complete the documents are. Revisions are handled against a new drawing issue or addendum, and the workbook records what changed so you can compare versions. Questions go to the estimator who built the sheet, not to a queue. Our construction estimating services page covers the wider scope we support.

Multi-Family Estimating Services Pricing

Our fee is quoted per project after we review the plan set, so there is no rate card to publish here. The quote follows the scope we can see: sheet count, number of trades in the bid package, alternates, allowances and any addenda issued before the bid date. A 60-unit garden apartment set with a full Division 03 through Division 16 scope prices differently from a two-sheet interior renovation, and we quote each on its own. Send the drawings through send your plans and we will confirm the fee and the delivery date together.

For early budgets, the calculator below converts a building area and your own base hard cost per square foot into hard cost, soft costs, contingency, escalation and an all-in cost per square foot. It carries no prices of its own; every dollar figure comes from the inputs you enter.

How quotes are calculated

We count the sheets and the schedules first, because a set with a door schedule, window schedule, finish schedule and mechanical schedule takes a different path than one with dimensions only. Then we scope the trades: cast-in-place concrete, wood framing or light-gauge steel framing, roofing, gypsum board, fire sprinkler and the rest. Each trade becomes a line-item quantity takeoff with a stated unit of measure and waste factor, and the fee reflects that scope rather than a single square-foot rate.

At the conceptual end, an AACE Class 4 or Class 5 estimate on a rentable square footage basis takes far less input than a Class 2 bid estimate built from construction documents. The same drawings priced for apartment building takeoff services and for a lender's budget review are two different deliverables, and we quote them separately.

What affects price and delivery time

Sheet count, trade count, alternates and addenda move both the fee and the delivery date. A set with three addenda that each revise Division 09 finishes needs the revisions traced through every affected quantity, and that work is priced in. A bid date that moves forward shortens the window we have, so tell us the date when you send the set and we will confirm what is achievable.

Delivery time is confirmed with the quote, not before. We do not publish hours or days, because a 40-sheet set and a 300-sheet set are not the same job. The date we give you is the date we hold.

Square-foot budget calculator

Hard cost
$444,000
Soft costs
$53,280
Contingency
$49,728
Escalation
$21,880
Budget total
$568,888
All-in per sq ft
$237

Enter your own base rate from a recent bid, cost book or estimator. The default values are placeholders for the math, not market prices.

Multi-Family Estimating Services Across the US

We serve all 50 states from one team, and the pricing data behind each estimate is adjusted for the region where the work is built. Wage levels differ by market, and public work carries prevailing wage requirements that change the labor line even when the drawings are identical. A multi-family material takeoff priced in one state will not transfer to another without that adjustment.

Material delivery is the second variable. Lumber, ready-mix concrete, steel mill products and copper wire and cable move on separate price cycles, so a wood framing package and a light-gauge steel framing package carry different escalation exposure. Climate drives assembly choices, from roof snow loads to freeze protection on plumbing, and local code editions change fire-rated assemblies and fire sprinkler requirements between jurisdictions. Confirm the adopted code edition with the building department before pricing.

At the conceptual estimate stage, regional unit costs and a plumbing fixture count per dwelling unit are usually enough to set a budget range. Our construction cost estimates are built from those regional inputs and reviewed by an estimator before they go out.

Frequently Asked Questions

How much does a Multi-Family estimate cost?

The fee is quoted per project after we review the plans. It depends on the number of buildings and dwelling units, the drawing set's completeness, the CSI MasterFormat divisions in scope, and whether you need a conceptual or a bid-level deliverable. Send the plan set and we return a written quote that states the scope and the deliverable format before any takeoff begins.

How long does a Multi-Family takeoff take?

The delivery date is set when we quote, based on gross floor area, unit count, building type, and how many trades are in scope. A single-building wood-frame set with complete architectural and MEP drawings moves faster than a podium project with a parking structure and alternates. We confirm the date in writing with the quote, and an addendum issued mid-takeoff resets it.

Do you estimate labor and material costs?

Yes. Each line carries a quantity, a unit of measure, a material cost, and a labor cost built from published wage data for the trade that installs it, then reviewed by an estimator. General conditions, permits, and contractor overhead and profit are priced as separate lines so you can see what each one adds. See our labor cost estimating services for how the wage side is built.

What drawings do you need?

Send the architectural, structural, mechanical, electrical, and plumbing sheets at construction documents stage, plus the civil and landscape set for site work. Schedules matter as much as plans: door, window, finish, plumbing fixture, mechanical, and panel schedules drive counts. For a conceptual or schematic design estimate, floor plans and a gross floor area figure are enough to start.

Can you use my estimate template?

Send your template with the plans and we confirm whether the estimate can be delivered in it. Most workbooks with a line-item structure map cleanly; templates with locked formulas or unusual cost-code hierarchies may need adjustment. The answer comes back with the quote, before plan review starts.

Do you sign NDAs?

Clients can request an NDA before sending drawings, and the terms are agreed before plan review begins. Send the document you want signed with your first message so the paperwork does not sit between you and the takeoff. Plans are used only to produce the estimate.

Do you provide multi-family estimating services for projects in more than one state?

Yes. We work nationally, and multi-family estimating services are priced from national average unit costs adjusted with published U.S. wage and price data for the project's market, then reviewed by an estimator. Tell us the city and state on the quote request so the labor rates and material pricing reflect the right market.

What is the difference between a conceptual and a bid-level multi-family estimate?

A conceptual estimate prices gross floor area and unit count with allowances for major systems, following AACE Class 4 or 5 logic. A bid-level estimate prices measured quantities from construction documents, division by division, with alternates and unit prices carried separately. The two are not interchangeable, and we state which class each deliverable represents.

How do you handle waste factors in a multi-family material takeoff?

Waste is applied per material, not as a blanket percentage. Gypsum board, lumber, and finishes carry typical waste ranges stated on the line; cast-in-place concrete and ready-mix are ordered to calculated volume. Each waste line shows the percentage used so you can compare it against your own purchasing history.

Can you break the estimate down by building or by dwelling unit?

Yes. We can subtotal by building, by floor, by unit type, or by division, provided the drawings identify the units consistently. Unit-type breakdowns are useful for apartment building cost estimates where a project mixes studios, one-bedrooms, and two-bedrooms, because the per-unit cost varies with plumbing fixture count and finish schedule.

Do you price alternates and allowances separately?

Yes. Alternates, unit prices, and allowances are carried as separate line items so the base bid stays clean for the bid package. An allowance line states what it covers and what triggers a change order. This keeps your bid form comparable when a GC asks for deduct alternates.

How do you treat parking structures and elevators in a multi-family estimate?

Podium and cast-in-place parking are priced under Division 03 concrete with their own formwork, reinforcement, and finishing lines, separate from the residential floors above. Elevators are priced as an equipment package with installation, and fire sprinkler and standpipe work is carried under the fire protection division. Mixing these into a per-square-foot rate hides the cost.

What format do I receive the estimate in?

You receive an Excel workbook and a PDF summary, with marked-up drawing pages showing what was measured and where. The workbook carries the quantity, unit of measure, waste factor, material cost, and labor cost on each line. The marked-up pages let you trace any number back to the sheet it came from.

Send your multi-family plans for a quote

Send the drawing set, the unit count, and the project location, and we return a written quote stating scope, deliverable format, and the confirmed delivery date. Plan review starts once the quote is accepted and any NDA is signed.

Request a Free Quote