Healthcare and Hospital Estimating for Contractors

Healthcare and hospital estimating at KNR serves general contractors, trade contractors and developers who need a defensible number before bid day. We take off architectural, structural, MEP and site scopes from your drawing set and return an Excel workbook and PDF summary with marked-up drawing pages. You get line items you can trace to a unit of measure, a measurement rule and a public data source.

  • Line items traced to unit and rule
  • CSI MasterFormat division structure throughout
  • Excel workbook, PDF summary, marked drawings
  • Fee quoted per project after plan review

Upload your plans

Send drawings and a short scope. You get a fixed price before any work starts.

What does healthcare and hospital estimating include?

Healthcare and hospital estimating covers a full quantity takeoff of the drawing set by CSI MasterFormat division, including Division 21 fire suppression, 22 plumbing, 23 HVAC, 26 electrical and 28 electronic safety, priced with national average unit costs adjusted by published U.S. wage and price data and reviewed by an estimator.

Our Professional Healthcare & Hospital Estimating

A hospital estimate fails in the joints between systems: the medical gas main that has to shut down before the ceiling grid opens, the nurse call rough-in that lands after the drywall closes, the imaging room shielding that changes the door frame. Our healthcare and hospital estimating work is built to expose those joints on paper, before they cost money in the corridor.

We measure from the drawing set you send, index every line to a CSI MasterFormat division, and show the arithmetic on the sheet. Volume items such as concrete and fill are taken in cubic yards, areas in square feet, pipe and conduit in linear feet, and fixtures, receptacles and devices as an each count. Every quantity carries the unit of measure and the measurement rule used to derive it, so a reviewer can re-measure any line and land on the same number.

We do not quote a fee or a delivery date up front. We review the plans, confirm the scope and the drawing issue, and then price the work per project. The same discipline carries into our restaurant estimates support for food service and dining areas inside medical campuses, where grease interceptor and hood work sit alongside clinical scope.

Illustrative takeoff lines — sample quantities and arithmetic, not a project price
Line itemDivisionQuantityUnitMeasurement ruleExtended check
Interior spread footings, 4,000 psi0396cubic yardsFooting schedule: L × W × D, summed by type96 cy × unit cost = extended cost
Gypsum board, 5/8 in. type X, two layers0918,400square feetWall length × height, both faces, less openings over 10 sf18,400 sf ÷ 32 sf per sheet = 575 sheets
Medical gas piping, type L copper, 1/2 in.231,240linear feetPlan scale, riser diagram, plus 5% typical waste1,240 lf × 1.05 = 1,302 lf purchased
Duplex receptacles, hospital grade26412each countDevice schedule count by room type, cross-checked to panel schedules412 ea × unit cost = extended cost
Cleanable vinyl wall base, 4 in.096,850linear feetRoom perimeter less door openings6,850 lf ÷ 100 lf per roll = 69 rolls

Quantities sorted by MasterFormat division

Material quantities are taken by CSI MasterFormat division, so the sheet sorts the same way your bid package does. Division 03 concrete is taken in cubic yards with formwork in square feet of contact area; Division 23 mechanical is taken in linear feet of pipe by size and material, with fittings, valves and hangers as each counts; Division 26 electrical runs in linear feet of conduit and conductor, with panels, devices and luminaires counted. Medical gas, vacuum and specialty piping are separated from domestic water and sanitary so the plumbing and medical-gas trades can each price their own scope. Waste factors are applied line by line at typical values and labeled as such, never buried in a lump sum.

Labor from crews, hours and wage basis

Labor is built from crew composition and productivity rather than a percentage of material. We state the trade, the crew mix, the hours per unit and the wage basis, then adjust published national wage data for the local market. Hospital work carries labor conditions that a shell building does not: night and weekend shifts in occupied wings, escorted access, tool control, and short work windows between procedures. Those conditions are shown as separate line items in Division 01 general conditions rather than averaged into the trade rates. Supervisory hours for first-line trades supervisors are carried where the crew size justifies them.

Priced workbook with marked-up drawings

The deliverable is an Excel workbook and a PDF summary with marked-up drawing pages, so the quantity behind each line is visible on the plan it came from. Each line shows quantity, unit, material cost, labor hours, labor cost, equipment and the extended total. Addenda are logged against the drawing issue they modify, and any line priced from a superseded sheet is flagged. This is the format a hospital construction cost estimating review needs when the owner's representative, the architect and the CM all check the same numbers. To start, send your plans through our get a quote page and we will confirm scope before pricing the takeoff.

What Is Included in Our Healthcare & Hospital Estimates?

A hospital drawing set is large, and the estimate has to show which sheets were read. Our healthcare facility takeoff services begin with a drawing log: sheet number, issue date, discipline and revision status. Anything shown on a sheet we did not receive is listed as a scope gap rather than assumed. That log is the first page of the workbook, and it is what makes the rest of the numbers auditable.

The estimate follows the 50-division CSI MasterFormat structure so the owner, the architect and the trade contractors read the same organization. Division 00 procurement and contracting requirements and Division 01 general conditions are carried as their own lines, because on occupied-campus work those costs are real and easy to miss. The same organization carries into the commercial estimating services we run for medical office buildings and outpatient work, so a campus with both building types reads as one document.

Division coverage in a typical hospital or clinic estimate
DivisionScope capturedTypical unit
00 / 01Procurement requirements, general conditions, infection-control measureslump sum, monthly
03Footings, slabs-on-grade, elevated slabs, equipment padscubic yards
05Structural steel, joists, deck, medical equipment supportstons, square feet
08Doors, frames, hardware, glazing, shielding doorseach count
09Gypsum board, acoustical ceilings, flooring, wall finishessquare feet
21 / 22 / 23Sprinkler, plumbing, medical gas, HVAC and controlslinear feet, each count
26 / 27 / 28Power, lighting, data, nurse call, fire alarm, securitylinear feet, each count
31Site clearing, excavation, backfill, utilitiescubic yards, linear feet

Architectural, structural and MEP scope by division

The takeoff covers the full building, not one trade. Structural scope runs through Division 03 concrete and Division 05 metals. Envelope and interiors run through Division 08 openings and Division 09 finishes. Building systems run through Division 21 fire suppression, Division 22 plumbing, Division 23 HVAC, Division 26 electrical, Division 27 communications and Division 28 electronic safety and security, with Division 31 earthwork at the site. Imaging suites, linear accelerators and cath labs are called out separately because their shielding, structural support and dedicated power do not price like a standard patient room. This is where healthcare and hospital estimating differs from a shell-and-core takeoff: the equipment-driven scope sits alongside the base building scope on the same sheet.

Quantities by unit of measure, with the counting rule

Every line states its unit and how it was derived. Floor finishes are net square feet after deducting columns and casework footprints; wall finishes are developed area by room type. Conduit, pipe and duct are linear feet by size and material, with fittings and hangers as each counts. Doors, frames and hardware are each counts tied to the door schedule, and hardware sets are counted per leaf so a pair of doors does not read as one. Equipment connections, medical gas outlets and nurse call devices are each counts cross-checked against the reflected ceiling plans and the room data sheets.

Materials, labor, equipment and cost breakdowns

Each line separates the cost drivers so a reviewer can challenge one without rebuilding the line:

  • Material quantity with waste factor shown separately and labeled typical.
  • Labor hours by trade, with crew mix and productivity basis stated.
  • Equipment cost, including lifts, temporary power and infection-control barriers.
  • Subtotal, then Division 01 general conditions, then contingency stated at the AACE estimate class the drawing maturity supports.
  • Sales tax and escalation shown as separate lines, not folded into unit costs.

Wage data comes from public U.S. Bureau of Labor Statistics sources and material movement from the Producer Price Index; the workbook shows which series was applied to which line. Healthcare and hospital estimating lives or dies on that traceability, because a hospital renovation cost estimate is reviewed by an owner's finance group as closely as by the trades.

Who Needs Our Healthcare & Hospital Estimating?

Different readers use the same workbook for different decisions. A specialty contractor needs the line that belongs to them; a general contractor needs the whole sheet to hold together against the bid form. We keep the divisions separate so both readings are possible from one document, and we label the AACE estimate class so nobody mistakes a Class 4 budget for a Class 2 bid number. Good construction estimates support both readings, which is why healthcare and hospital estimating starts with the division structure rather than a single lump sum.

Medical, mechanical and electrical subcontractors

Specialty contractors bidding hospital work carry the highest coordination risk on the job. A mechanical contractor needs Division 23 quantities tied to the equipment schedule, with medical gas and vacuum separated from HVAC piping. An electrical contractor needs Division 26 feeder and branch quantities with the essential-branch and emergency-power scope called out, since a hospital's life safety loads follow NFPA 101 and NFPA 99 rather than a standard commercial panel layout. Each subcontractor gets a quantity sheet they can price against their own labor rates and a list of the assumptions behind it.

General contractors and home builders

A general contractor assembling a healthcare construction bid estimate needs the trade packages to sum without gaps. We identify Division 01 general conditions separately, flag scope gaps between packages, and note where an addendum changed a spec section or a drawing. For a medical office building estimating package, the shell, core and tenant fit-out are taken as separate scopes so the developer can compare a base building budget against a fitted-out suite. Our commercial estimating services page covers the non-clinical side of the same portfolio.

Developers, architects and suppliers

Owners and developers use the estimate to test a pro forma before design is complete, which is why the contingency line follows the AACE estimate class rather than a flat percentage. Architects use the marked-up drawings to see which sheets drove the largest quantities and where a design change would move cost. Suppliers use the each-count and linear-foot schedules to build quotes and submittals. For early-stage budgeting across a portfolio, our construction cost estimating services page explains how class of estimate and design completeness are matched.

Types of Healthcare & Hospital Projects We Estimate

Scope changes with the building type, and so does the estimate. A ground-up hospital carries sitework, structural and full MEP; a renovation inside an operating facility carries demolition, temporary partitions and phased utility shutdowns that can outweigh the trade work itself. We ask for the project type and the occupancy classification up front, because IBC occupancy drives egress, fire rating and sprinkler scope before a single finish is measured. That is the first branch in our healthcare and hospital estimating workflow, and it decides which CSI MasterFormat divisions carry the money.

Residential projects

Residential healthcare work means assisted living, memory care, skilled nursing and group homes, often built under IRC or IBC Group R provisions with a commercial kitchen and a nurse station. The takeoff emphasizes Division 09 finishes, Division 22 plumbing fixture counts per resident room, and Division 26 nurse call and access control. For the residential side of a mixed portfolio, our hotel and hospitality estimating page covers the room-count logic that carries over to senior living.

Commercial buildings

Medical office buildings, ambulatory surgery centers, imaging centers and clinics fall here. A hospital renovation cost estimate for an occupied medical office building must carry Division 02 demolition in cubic yards of debris and square feet of partition removal, Division 01 infection-control barriers, and Division 28 access control and intrusion detection for pharmacy and records rooms. Surgical suite construction estimating adds restricted-area finishes, HEPA filtration and medical gas outlets per the room data sheets. Our office and tenant improvement estimating page covers the fit-out side of the same buildings.

Industrial and infrastructure projects

Central plants, boiler and chiller replacements, emergency generator additions and campus utility work sit outside the clinical envelope but inside the hospital's risk. These estimates lean on Division 23 equipment, Division 26 switchgear and paralleling gear, and Division 31 excavation in cubic yards for vaults and duct banks. Tie-ins to live systems are priced as separate line items with the shutdown window stated. Our retail and shopping center estimating page shows a comparable approach to phased work in occupied space, and the same discipline runs through our healthcare and hospital estimating on campus utility packages.

Our Healthcare & Hospital Estimating Process

Every healthcare and hospital estimating assignment starts from the same question: which drawing set is current, and which addenda are incorporated? We log the sheet index, the issue date and the revision cloud status before a single quantity is measured, because a takeoff run on a superseded set is the most expensive error in the file. From there the work moves through three steps, each with a named check.

A hospital project rarely fits one CSI MasterFormat division cleanly. Foundation and sitework quantities sit in Division 31 and Division 03, while the clinical build-out runs through Division 05, 08, 09 and the MEP divisions. We keep the healthcare construction quantity takeoff organized by division and by bid package so a subcontractor can price only the scope they hold. The same division-by-package structure carries over to our office and tenant improvement estimates, where a shell-and-core base building and a clinical fit-out are priced as separate scopes.

  1. Submit drawings and specifications

    Send the architectural, structural, MEP and civil sets together with the project manual, and tell us the estimate class you need. A schematic design package supports an AACE Class 4 or 5 budget with parametric allowances; a 95% construction document set supports a Class 2 or 3 bid-ready estimate. We confirm receipt of each addendum and spec section so nothing is priced against the wrong revision.

  2. Plan review and digital takeoff

    We review the drawings on screen, set the scale per sheet, and measure each line item in its own unit of measure: square feet of gypsum board, linear feet of medical gas piping, cubic yards of concrete, each count of isolation room doors and air valves. General conditions — temporary partitions, negative air machines, temporary power — are taken off as separate lines rather than buried in a percentage. Every measurement rule is recorded so the quantity can be traced back to a sheet and a dimension.

  3. Cost calculation, quality checks and delivery

    Quantities are priced with national average unit costs, then adjusted with published wage and price data and reviewed by an estimator. A second estimator checks a sample of line items against the drawings, confirms waste factors are applied where the material requires them, and verifies that subtotals and extensions add correctly. You receive the Excel workbook, the PDF summary and the marked-up drawing pages. To start, send your plans through our request a quote page.

Sample Healthcare & Hospital Estimate and Deliverables

The example below is illustrative only. It shows how a surgical suite construction estimating package is structured, not a price for any real project. Assumptions: a 4,000 square foot operating suite fit-out inside an existing hospital, four operating rooms, a 9-foot ceiling, and unit costs drawn from a national average database before location adjustment.

Quantities are measured from the drawing set and rounded up to the nearest whole unit. Waste factors are applied to sheet goods and linear materials, not to each-count items. The bid package is split so the drywall and ceiling trades, the MEP trades and the specialty medical gas contractor each receive only the lines they price.

Illustrative surgical suite fit-out — 4,000 sf, four operating rooms (not a quote)
Line itemQtyUnitUnit cost rangeExtended range
Division 05 — structural steel reinforcement, OR ceiling supports1.8tons$4,200 – $5,600$7,560 – $10,080
Division 09 — gypsum board partitions, 2 layers each side, incl. 10% waste8,800sf$3.10 – $4.25$27,280 – $37,400
Division 09 — acoustic ceiling tile and grid, incl. 5% waste4,200sf$2.40 – $3.30$10,080 – $13,860
Division 23 — OR supply air valves and terminal boxes16each$1,850 – $2,600$29,600 – $41,600
Division 22 — medical gas piping, oxygen and vacuum, incl. 5% waste1,260lf$48 – $72$60,480 – $90,720
Division 26 — isolated power panels and receptacles4each$9,500 – $13,000$38,000 – $52,000
General conditions — temporary partitions and negative air1lot$42,000 – $58,000$42,000 – $58,000
Total (before contingency and escalation)———$215,000 – $303,720
  • Excel quantity takeoff sheet

    The workbook carries one row per line item with the CSI MasterFormat division, spec section reference, quantity, unit of measure, waste factor and the drawing sheet it came from. Division 05 structural steel and Division 09 finishes sit on separate tabs, and each tab totals by trade so a subcontractor can filter to their scope. Formulas are left live so you can change a unit cost and see the extension update.

  • Marked-up drawings

    Each measured area is highlighted on the PDF sheet with the quantity and color-coded by trade, so a reviewer can spot-check a wall length or a ceiling area against the dimension strings. Revision clouds on the current set are noted where they changed a quantity. Markups stay tied to the sheet number, which matters when an addendum reissues a plan.

  • Itemized cost estimate

    The cost summary groups line items by division and adds general conditions, contingency and escalation as visible lines rather than a lump sum. Each line shows the unit cost, the extension and the source basis. The summary is delivered as a PDF alongside the workbook so it can be circulated without exposing the full takeoff.

Software and Pricing Data We Use

A hospital mep takeoff fails quietly when a unit of measure changes mid-sheet, for example when ductwork is measured in pounds on one sheet and square feet of surface area on another. We fix the unit per line item at the start and keep it consistent through the workbook. The same discipline applies to Division 08 door and hardware sets, where each door is counted once and its frame, leaf and hardware are sub-lines rather than separate items that can be double-counted.

Scope gaps usually appear where two packages meet: firestopping between a Division 09 wall and a Division 21 penetration, or controls wiring between Division 23 and Division 26. We flag those interfaces explicitly so the bid package does not leave them unassigned. The same interface discipline carries into school and education building estimates, where corridor ratings and classroom acoustics create comparable Division 09 and Division 23 handoffs.

Takeoff and estimating software

We work in three tool categories: PDF and on-screen takeoff for measuring from the drawing set, spreadsheet-based estimating for the line-item build-up and formulas, and published cost databases for unit cost baselines. The chart below tracks the Producer Price Index series for the materials that dominate this scope, rebased to 100, so you can see how material cost pressure has moved over the period shown.

Regional material and labor pricing method

Unit costs start from a national average, then move with two inputs: the BLS wage table below for the trades in the scope, and the Producer Price Index series in the chart for lumber, ready-mix concrete, steel and copper wire. A location factor adjusts for the local market, and prevailing wage requirements on publicly funded work are applied where they govern. The estimator reviews the adjusted total before delivery, since index movement and wage data do not capture every project condition.

Material price movement, Oct 2023 to Sep 2026

85118150Oct 2023Sep 2026
Lumber and wood products: +14.6%Ready-mix concrete: +6.3%Steel mill products: +27.8%Copper wire and cable: +47.5%
Index rebased to 100 at Oct 2023. Source: U.S. Bureau of Labor Statistics, Producer Price Index (WPU081, WPU1333, WPU1017, WPU102502), updated 2026-10-25.
U.S. hourly wages for the trades in this scope (latest BLS release)
Occupation25th percentileMedian75th percentile
Construction laborers$18.57$22.66$28.72
Carpenters$23.32$29.12$36.94
Electricians$23.76$30.38$40.36
Plumbers, pipefitters and steamfitters$24.13$30.67$40.92
Cement masons and concrete finishers$22.60$27.41$32.15
First-line supervisors, construction trades$30.48$38.42$48.78
Cost estimators$29.40$37.86$48.97

Base wages before payroll taxes, insurance and benefits. Source: BLS Occupational Employment and Wage Statistics, national, all industries.

Why Contractors Choose Our Estimating Services

The value of a healthcare construction bid estimate is not the total at the bottom; it is whether every line can be defended when the owner's representative asks how a number was reached. Each line in our workbook carries a quantity, a unit, a measurement rule and a cost basis. That structure is what lets a general contractor submit a bid with confidence and what lets a subcontractor challenge a scope assumption before the bid date rather than after. The same discipline carries into other occupied-building work, such as professional retail and shopping center estimating, where phasing and after-hours constraints drive cost the way infection control does in a hospital.

Trade-specific expertise

Healthcare work concentrates risk in a few divisions: Division 09 partitions and finishes around imaging rooms, Division 21 fire suppression in occupied buildings, and the medical gas and isolated power systems that have no equivalent in a typical commercial job. Our estimators measure each of these with the correct unit and the correct waste factor, and they know that a waste factor on gypsum board is not the same allowance as on ceiling tile.

Quality control and clear assumptions

Every estimate ships with a written assumptions page: which drawing revision was used, which addendum was incorporated, what is excluded, and how contingency was set. A second estimator checks extensions and a sample of quantities against the marked-up sheets. If a spec section is ambiguous, we list it as an open item rather than guessing silently.

Turnaround, communication and revisions

Delivery dates are agreed when we review the plans and confirm the scope, not quoted before we have seen the set. If an addendum reissues drawings after we start, we note which quantities change and revise the affected tabs. Questions during review go to the estimator who built the sheet, so the answer matches the arithmetic. Start with our commercial estimating services or send the set for a scoped quote.

Healthcare & Hospital Estimating Pricing

We do not publish a rate card, because a hospital renovation cost estimate and a ground-up clinic takeoff do not carry the same effort. The fee is quoted per project after we review the drawing set and the spec sections you want priced. Send the plans and we will return a written scope of what the fee covers, including which CSI MasterFormat divisions are measured and which are excluded.

The calculator below is a budget tool, not a fee calculator. You enter building area, your own base hard cost per square foot, soft-cost percentage, contingency percentage and escalation percentage, and it returns hard cost, soft costs, contingency, escalation, budget total and all-in cost per square foot. It carries no prices of its own and no building-type assumptions. Use it to frame the budget you hand to an owner before a single line item is measured, and treat the output as a placeholder until healthcare and hospital estimating replaces the assumed rate with measured quantities.

For clinic construction cost estimating, the effort tracks the number of rooms and the density of Division 21 fire suppression, medical gas and sprinkler routing rather than gross floor area alone. A dialysis clinic with 40 linear feet of med-gas branch per station takes longer to measure than an open physical therapy suite of the same size. That difference in measurement effort is why healthcare and hospital estimating is quoted from the sheets rather than from a per-square-foot fee.

How quotes are calculated

We price the work from the sheets we actually receive: sheet count by discipline, the number of trades measured, alternates and unit prices requested, and the number of addenda in the bid package. A set with architectural, structural, mechanical, electrical, plumbing, fire protection and low-voltage drawings across 200 sheets is a different quote from a 30-sheet interior fit-out. Tell us the bid date and the divisions you need and we will confirm the fee and the delivery date together in writing. We do not quote from a sample or a prior project of similar size, because scope gaps hide in the difference. If you want a second opinion on a single division, our professional quantity takeoff services can be scoped to that division alone.

What affects price and delivery time

Four things move both the fee and the date: the number of sheets and whether they are bid-ready or schematic, the number of trades and spec sections measured, the count of alternates and addenda, and the complexity of the MEP systems. Imaging equipment, isolation rooms, pharmacy clean rooms and nurse call all add line items that a general commercial set does not carry. Delivery is confirmed with the quote, and we do not state a turnaround before we have seen the plans. Late addenda and revised sheets reset the measurement on the affected pages, so a firm bid date helps us sequence the work. When you are ready, send your plans with the bid date and the divisions you need.

Square-foot budget calculator

Hard cost
$444,000
Soft costs
$53,280
Contingency
$49,728
Escalation
$21,880
Budget total
$568,888
All-in per sq ft
$237

Enter your own base rate from a recent bid, cost book or estimator. The default values are placeholders for the math, not market prices.

Healthcare & Hospital Estimating Across the US

Hospital construction cost per square foot varies by region for reasons that show up in the line items, not just in the total. Union and prevailing-wage projects on public or publicly funded work carry higher installed labor rates, and our labor cost estimates are built from published U.S. Bureau of Labor Statistics wage data for the trades on the sheet, then adjusted for the project location. The wage table on this page shows the national medians we start from.

Material delivery changes the number too. Ready-mix concrete, structural steel and copper wire and cable price differently by distance from the plant, mill or distributor, and the Producer Price Index series for those commodities shows how far they have moved in the last twelve months. Climate drives envelope and mechanical scope: freeze protection and snow loads in the upper Midwest, humidity control and chiller redundancy in the Gulf states. Seismic detailing adds Division 05 connections on the West Coast.

Code editions differ by jurisdiction. Confirm with the local building department which edition of the IBC, NFPA 101 and NFPA 99 applies, because the adopted edition changes egress, smoke compartment and medical gas requirements and therefore the square feet of rated assembly and the linear feet of pipe. We serve all states from one team, so a drawing set from any jurisdiction is measured against the code edition you name, and the same discipline carries into professional church and religious building estimating where assembly occupancy rules drive the egress counts.

Frequently Asked Questions

How much does a healthcare & hospital estimate cost?

The fee is quoted per project after we review the drawings. It depends on the number of sheets and disciplines, the mix of new construction and renovation, the density of MEP and medical equipment scope, and whether you need a full CSI MasterFormat estimate or a targeted bid package. Send the drawing set and specifications for a quote.

How long does a healthcare & hospital takeoff take?

The delivery date is set with the quote and confirmed before work starts. It depends on drawing set size, how many disciplines are in scope, the quality of the documents, and how much of the work is phased renovation in occupied space. We do not publish a standard turnaround because hospital packages vary widely in sheet count.

Do you estimate labor and material costs?

Yes. Material quantities carry units and waste factors, and labor is priced by trade using published U.S. Bureau of Labor Statistics wage data adjusted for the local market, then reviewed by an estimator. General conditions, contingency and escalation are carried as separate lines so you can see what each one adds to the total.

What drawings do you need?

Send the architectural, structural, mechanical, electrical and plumbing sheets with the specifications, and any addenda issued to date. For hospital renovation work, existing and as-built drawings help confirm what is being demolished versus reused. Incomplete sets are workable if you tell us which sheets are pending.

Can you use my estimate template?

Send your template with the plans and we confirm whether the estimate can be delivered in it. The workbook we deliver is Excel with a PDF summary and marked-up drawing pages, so column structures and CSI MasterFormat sorting can usually be matched. We confirm the format before plan review begins.

Do you sign NDAs?

Clients can request an NDA before sending drawings, and the terms are agreed before plan review starts. Send the document you want signed along with your request so the paperwork is settled before any files change hands. We do not publish a standard NDA policy.

Which CSI MasterFormat divisions appear in a hospital estimate?

A typical hospital package touches Division 00 and 01 for general conditions, Division 02 for sitework, Division 03 for concrete, Division 05 for structural steel, Division 08 for doors and hardware, Division 09 for finishes, Division 21 for fire suppression, Division 22 for plumbing, Division 23 for HVAC, Division 26 for electrical, Division 27 for communications and Division 28 for electronic safety and security. Division 31 covers earthwork on new buildings.

How do you handle infection control and life safety scope in a hospital renovation cost estimate?

Infection control measures are carried as separate line items rather than buried in general conditions. Expect temporary barriers, negative air machines, anterooms and daily cleaning priced by linear feet of barrier and by month of duration, plus NFPA 101 and NFPA 99 compliance items such as fire-rated partition integrity and medical gas verification. The IBC occupancy classification drives egress and sprinkler scope.

What is an AACE estimate class and which one do you produce?

AACE estimate classes run from Class 5, a rough order of magnitude, to Class 1, a definitive estimate. The class we produce follows the drawing completeness you send: schematic sets support a Class 4 or 3 budget, while permit and construction sets support a Class 2 bid estimate. We state the class on the cover sheet so the reader knows how much contingency the number carries.

Can you price a hospital construction cost per square foot benchmark?

We can, but only as a cross-check, not as the estimate. Square-foot benchmarks hide the drivers that matter in healthcare: imaging suites, surgical suite construction estimating with lead-lined walls and laminar flow ceilings, and interstitial mechanical space. The line-item takeoff is the deliverable; the square-foot figure is a sanity check against it.

How do you avoid scope gaps between bid packages?

Every line carries a CSI MasterFormat division and spec section, so the boundaries between packages are visible. We list items that fall between trades, such as firestopping, seismic bracing, controls wiring and medical gas rough-in, and flag them rather than assigning them silently. Addenda are logged and the affected quantities are revised.

Do you estimate medical equipment and owner-furnished items?

We can list owner-furnished, contractor-installed equipment as a separate schedule with quantities and rough-in requirements, kept out of the construction subtotal. Imaging equipment, sterilizers and casework are usually procured by the owner but still drive electrical, structural and plumbing scope. Separating them keeps the bid estimate comparable.

What does a healthcare and hospital estimating deliverable look like?

The deliverable is an Excel workbook, a PDF summary and marked-up drawing pages showing where each quantity was taken off. Every line shows the unit of measure, the measurement rule, the arithmetic and the data source behind the price. That traceability is what lets a reviewer check a number instead of trusting it.

Send Drawings for a Healthcare Estimate

Send your architectural, structural, mechanical, electrical and plumbing sheets with the specifications and any addenda. We review the set, confirm the estimate class and format with you, and quote the fee before plan review begins.