KNRConstructionsSend Plans

Restaurant Estimating Services for Contractors

Our restaurant estimating services give general contractors and food service trades a line-by-line quantity takeoff of the kitchen, dining room and back-of-house scope. We count equipment, measure pipe, duct and finishes, and price the work from public wage and producer price data. You receive an Excel workbook, a PDF summary and marked-up drawing pages.

  • Equipment schedules counted by each, not lumped
  • Hood, duct and MEP measured from the plans
  • Excel workbook, PDF summary and marked drawings
  • Every quantity tied to a unit and a drawing

Upload your plans

Send drawings and a short scope. You get a fixed price before any work starts.

What does a restaurant construction cost estimate include?

A restaurant construction cost estimate covers Division 11 equipment, plumbing, HVAC, electrical and finish scope measured from the drawings. Our restaurant estimating services list each item with its unit, measurement rule and arithmetic, so you can check the count against the equipment schedule and the plan review set.

Our Professional Restaurant Estimating Services

A restaurant estimate fails in the same place every time: a scope line that nobody priced. The walk-in freezer is on the equipment schedule but not in the Division 11 budget, the grease interceptor is buried in a note on the plumbing sheet, and the hood's makeup air is assumed to be "by others." Our restaurant estimating services close those gaps by measuring from the drawings and tagging every number to a sheet, a detail, or a schedule line.

We read the full drawing set the way a bid package is read: architectural, food service equipment, plumbing, mechanical, electrical, and the health department notes that govern finishes. Each restaurant construction cost estimate is organized by CSI MasterFormat division so your subcontractors can pull their scope without sorting through someone else's format. The same division-by-division structure carries over to our hotel and hospitality estimates support, where a kitchen, laundry, and banquet servery sit under one roof.

Kitchen and finish quantity takeoffs

We measure quantities from the plans and count what cannot be scaled. Linear foot for quarry tile cove base, FRP wall panel runs, grease duct, and stainless steel worktable edges; square foot for kitchen floor tile, ceiling tile, and walk-in panel area; each count for floor sinks, hand sinks, hose reels, and fire suppression nozzles. The deliverable is a line-item workbook with the measurement rule noted beside each quantity, plus marked-up drawing pages showing where the takeoff was pulled.

Trade-by-trade installation labor

Labor is built trade by trade from crew hours, not applied as a percentage of material. We separate straight-time installation from overtime and shift work, which matters on a restaurant because kitchen equipment setting and hood installation often happen on a compressed night schedule after the shell is closed. Wage inputs come from published U.S. Bureau of Labor Statistics data and are adjusted for the project's market, then a senior estimator reviews the crew logic.

Bid-leveling workbook and PDF summary

The final package is an Excel workbook and a PDF summary, both structured for bid leveling: one column per bidder, quantities on the left, unit costs in the middle, and alternates and allowances called out separately. You can see the arithmetic in every cell and the source behind every rate. To start, send your plans through our quote request and we will confirm scope and fee after reviewing the set.

What Is Included in Our Restaurant Estimates?

A commercial kitchen takeoff is not a single line. It is equipment, utilities, finishes, and life safety measured separately because they are bought and installed by different trades under different contracts. Our restaurant estimating services keep those scopes apart so a missing Division 11 item does not hide inside a mechanical allowance. Where a project also carries base-building work, our commercial estimating services cover the shell and core lines so the kitchen scope is not priced in isolation, and projects with clinical or dietary service areas can draw on our healthcare and hospital estimating for the plumbing and medical gas conventions that carry over.

Typical units and measurement rules for restaurant scope lines
Scope lineCSI divisionUnitMeasurement rule
Type I hood canopy11 40 00Linear footMeasured along the canopy length per appliance lineup
Grease duct23 00 00Linear footCenterline run from hood collar to roof discharge
Walk-in cooler / freezer11 41 00EachCounted from equipment schedule with panel area noted
Conveyor dishwasher11 40 00EachCounted, with water, drain and vent connections listed
Quarry tile floor09 30 00Square footNet floor area plus typical waste
FRP wall panel09 77 00Square footWall elevation area between cove base and ceiling
Grease interceptor22 13 00EachSized by fixture units, counted once per kitchen
Floor sink22 40 00EachCounted per equipment and prep location

Kitchen equipment, hoods, plumbing and finish scope

  • Division 11 equipment: ranges, ovens, fryers, steamers, prep tables, shelving, walk-in cooler and freezer boxes with their refrigeration packages, ice machines, and conveyor dishwashers, counted by each and cross-checked against the equipment schedule.
  • Hoods and exhaust: Type I hoods by linear foot of canopy, grease duct by linear foot and gauge, exhaust fan CFM, makeup air unit capacity, and the Ansul fire suppression system by appliance count and nozzle count.
  • Division 22 plumbing: floor sinks, floor drains, grease interceptor sized by fixture units, hand sinks, mop sinks, water heaters, and gas piping to cooking equipment.
  • Division 23 HVAC: kitchen exhaust and makeup air, dining room supply and return, and the exhaust CFM balance between them.
  • Finishes: quarry tile floors and cove base, FRP wall panels, ceiling systems, and dining room finishes by square foot.
  • Electrical: panel schedule review, dedicated equipment circuits, hood interlocks, and kitchen equipment connections.

Linear feet, square feet, each counts and equipment schedules

Each line carries a unit and a measurement rule. Hood canopies and grease duct run in linear foot; kitchen and dining floor finishes in square foot; equipment, fixtures, and devices in each count. Where a dimension is missing from the plans, we flag it rather than assume, and we note the assumption in the workbook so you can close it before bid day.

Materials, labor, equipment and cost breakdowns

Every line splits into material, labor hours, and equipment where a rental or crane is genuinely needed. Unit costs start from national averages, adjust with published wage and producer price data, and are reviewed by an estimator before release. Sales tax, freight, and the general contractor's markup sit on separate lines so you can turn them on or off for your own bid structure.

Who Needs Our Restaurant Estimating Services?

Restaurant work sits between three trades that rarely share a takeoff: food service equipment dealers, mechanical and plumbing contractors, and the general contractor holding the schedule. A restaurant quantity takeoff that separates their scopes lets each bidder price only what they install. The same division-by-division structure gives owners and designers construction estimates support that hold up when the set is compared against subcontractor pricing.

Food service and mechanical subcontractors

Food service equipment dealers use the equipment schedule takeoff to price Division 11 supply and installation, including utility rough-in points. Plumbing and mechanical contractors use the Division 22 plumbing and Division 23 HVAC quantities to price floor sinks, grease interceptors, hood exhaust, and makeup air. Electrical contractors get panel schedule review and dedicated circuit counts, including the conveyor dishwasher and other hard-wired appliances by each count.

General contractors and home builders

A general contractor carrying a restaurant build-out needs a complete budget before subcontractor bids land, plus a format that supports bid leveling once they do. Our restaurant estimating services give you that baseline, with alternates and allowances separated so owner changes do not distort the comparison. Builders converting a retail shell or a residential space into a restaurant get the same division-by-division structure.

Developers, architects and suppliers

Developers use the estimate to test a pro forma before committing to a tenant build-out. Architects use the plan review estimate to catch scope gaps before the set goes out for bid, particularly around health department finish requirements and ADA restroom clearances. Suppliers use quantity takeoffs to size equipment packages and material orders against real measured quantities.

Types of Restaurant Projects We Estimate

The scope changes with the building, not with the menu. A tenant build-out in a strip center carries different utility work than a ground-up freestanding building, and the kitchen equipment takeoff has to reflect which of those conditions the drawings actually show. Our restaurant estimating services follow the same rule on every project type: each line carries its unit, its measurement rule, and the drawing or schedule it came from.

Residential projects

Conversions of a house or a mixed-use ground floor into a cafe or small restaurant bring residential framing, limited electrical capacity, and a grease interceptor that may need to go in a crawlspace or exterior vault. We measure the added Division 23 HVAC and exhaust work separately from the existing system, and we flag where the panel schedule cannot carry the kitchen load. See our office and tenant improvement estimating for the shell-side scope.

Commercial buildings

Most restaurant work is a build-out inside a retail or mixed-use shell, so the estimate focuses on the Type I hood and grease duct route to the roof, makeup air, dining room finish takeoff, and the health department finish schedule. Our retail and shopping center estimating covers the shell and sitework that surrounds the kitchen, and our commercial estimating services cover the base building systems the tenant ties into. Where the same shell serves a clinic or hospital cafeteria, our healthcare and hospital estimating follows the same division-by-division method.

Industrial and infrastructure projects

Commissaries, central kitchens, and institutional food service facilities add process piping, large refrigeration, and heavier electrical service than a restaurant. We treat these as light industrial scope, with equipment counted from the schedule and the quantity takeoff organized by division so the mechanical and electrical packages can be bid separately. Our construction estimating services cover the broader building scope around the kitchen, and the restaurant estimating services scope stops at the kitchen and dining envelope so the two do not double-count.

Our Restaurant Estimating Process

Every takeoff starts with a complete drawing set: architectural floor plan, reflected ceiling plan, kitchen equipment schedule, plumbing riser, HVAC and hood schedule, and the electrical panel schedule. If the kitchen consultant's equipment schedule is missing, we mark the gap on the query sheet rather than guessing appliance counts. Our restaurant estimating services follow the same discipline on front-of-house finishes, where a dining room finish takeoff is only as good as the labeled room finishes on the plan.

We sort scope by CSI MasterFormat division before measuring — Division 11 for equipment, Division 22 for plumbing, Division 23 for HVAC, Division 26 for electrical — so the restaurant build-out estimate separates trade packages that a general contractor will actually bid out. Each measured item carries a unit, a measurement rule and the drawing sheet it came from.

  1. Submit drawings and specifications

    Send the plan set, specifications, equipment schedule and any addenda through our quote request page. We log the revision date of each sheet so a later addendum does not silently overwrite quantities already measured. Where the architect has issued alternates or allowances, list them at submission; they change how the base bid is assembled, and the same convention carries into our office and tenant improvement estimates when a shell space is fitted out, or into church and religious building estimates where a fellowship hall kitchen is part of the scope.

  2. Plan review and digital takeoff

    An estimator reviews the set for scope gaps before measuring: missing grease interceptor sizing, a type I hood without a makeup air unit shown, or a walk-in cooler with no door schedule. On-screen takeoff then measures wall and floor areas, linear runs of grease duct, and each count of floor sinks, worktables and ranges. The kitchen hood and ansul system scope is traced from the hood schedule to the fire suppression plan so the two do not double-count, and the equipment schedule drives the kitchen equipment takeoff line by line.

  3. Cost calculation, quality checks and delivery

    Quantities are priced with national average unit costs adjusted by published wage and price data, then checked by a second estimator against the equipment schedule and panel schedule. You receive the Excel workbook, the PDF summary and marked-up drawings, with assumptions listed so your team can run bid leveling against competing quotes line by line. The fee for restaurant estimating services is quoted per project after we review the plans.

Sample Restaurant Estimate and Deliverables

The table below is an illustrative excerpt from a 3,200 square foot fast-casual build-out, not a quotation. It assumes a type I hood over a four-burner range and fryer battery, one 1,200 lb walk-in cooler, one 800 lb walk-in freezer, and a conveyor dishwasher at the dish station.

Check the arithmetic: 24 LF of hood at $1,150–$1,450 per LF extends to $27,600–$34,800; 6 each of stainless steel worktables at $1,050–$1,350 extends to $6,300–$8,100. The two subtotals and the total row follow the same multiplication, and the total is the sum of the extended ranges, not of the midpoints.

Our restaurant estimating services always carry alternates — a second fryer battery, an upgraded makeup air unit, or quarry tile in place of sealed concrete in the dish area. We price each alternate as a separate line so the owner can accept or reject it without disturbing the base scope, and every line traces back to the drawing sheet through our quantity takeoff services.

Illustrative excerpt — fast-casual restaurant, 3,200 SF (not a quotation)
ItemQtyUnitUnit cost rangeExtended range
Type I kitchen hood with exhaust fan and grease duct24LF$1,150 – $1,450$27,600 – $34,800
Ansul wet chemical fire suppression system1each$4,200 – $5,600$4,200 – $5,600
Stainless steel worktable, 30 in x 96 in6each$1,050 – $1,350$6,300 – $8,100
Walk-in cooler, 1,200 lb, with refrigeration1each$9,500 – $12,000$9,500 – $12,000
Conveyor dishwasher with booster heater1each$11,000 – $14,500$11,000 – $14,500
Floor sink, cast iron, with trap primer4each$650 – $900$2,600 – $3,600
Quarry tile floor, dish and prep area420SF$9.50 – $13.00$3,990 – $5,460
FRP wall panel with cove base310SF$7.25 – $10.50$2,248 – $3,255
Subtotal, listed lines———$67,438 – $87,315
  • Excel quantity takeoff sheet

    One row per item, with description, quantity, unit, measurement rule, drawing sheet reference and cost code. Filters are set by CSI division so a plumbing subcontractor can pull only Division 22 lines and an equipment dealer only Division 11 lines.

  • Marked-up drawings

    Color-coded clouds and quantity tags on the plan pages: hood and duct runs in one color, plumbing fixtures and floor sinks in another, equipment counts tagged at each location. The markup lets your superintendent verify a quantity against the sheet it came from.

  • Itemized cost estimate

    Material, labor and equipment columns per line, with a separate schedule for allowances and alternates and a written assumptions page. Labor hours are shown so you can test them against your own crew rates before the bid goes in, which is the part of restaurant estimating services that most often changes the number.

Software and Pricing Data We Use

Quantities come from the drawings; prices come from published data. The restaurant mep takeoff is measured on-screen from the plumbing, mechanical and electrical sheets, then priced against a national unit cost database and adjusted for the project's state and metro. The chart below tracks the Producer Price Index series for the materials that move a kitchen package most — steel for hoods and worktables, copper for wire and piping, lumber and ready-mix for the shell work.

Two items deserve their own line rather than an allowance: the grease interceptor and the grease duct. Interceptor size is set by fixture units and local pretreatment rules, so we price it from the plumbing schedule, not a square-foot factor. Grease duct length is measured from the hood collar to the roof discharge, and any allowance for it is stated as a percentage with the basis written out. The same discipline carries into our restaurant estimating services and into school and education building estimates, where equipment schedules and kitchen scopes follow the same line-item logic.

Takeoff and estimating software

We work in three tool categories: PDF and on-screen takeoff for measuring and marking up drawings, spreadsheet-based estimating for the line-item build-up, and subscription cost databases for unit prices. Quantities and prices stay in separate columns so a unit-price update never disturbs the measured quantity.

Regional material and labor pricing method

Base unit costs are national averages, adjusted by location factor, prevailing wage requirements where the project is publicly funded, and project conditions such as occupied-building work or after-hours access. Labor rates are benchmarked to the wage table below, which shows BLS OEWS medians for the trades in a restaurant fit-out — electricians, plumbers and pipefitters, carpenters and construction laborers. The estimator reviews every adjustment before the workbook is released.

Material price movement, Oct 2023 to Sep 2026

85118150Oct 2023Sep 2026
Lumber and wood products: +14.6%Ready-mix concrete: +6.3%Steel mill products: +27.8%Copper wire and cable: +47.5%
Index rebased to 100 at Oct 2023. Source: U.S. Bureau of Labor Statistics, Producer Price Index (WPU081, WPU1333, WPU1017, WPU102502), updated 2026-10-25.
U.S. hourly wages for the trades in this scope (latest BLS release)
Occupation25th percentileMedian75th percentile
Construction laborers$18.57$22.66$28.72
Carpenters$23.32$29.12$36.94
Electricians$23.76$30.38$40.36
Plumbers, pipefitters and steamfitters$24.13$30.67$40.92
Cement masons and concrete finishers$22.60$27.41$32.15
First-line supervisors, construction trades$30.48$38.42$48.78
Cost estimators$29.40$37.86$48.97

Base wages before payroll taxes, insurance and benefits. Source: BLS Occupational Employment and Wage Statistics, national, all industries.

Why Contractors Choose Our Estimating Services

A restaurant is a small building with dense MEP, and the trades that lose money on it are the ones that measured from the wrong sheet. Our hood and duct takeoff follows the hood schedule to the exhaust fan and the makeup air unit, so the sheet metal contractor sees the full run rather than a stub. Plumbing is counted fixture by fixture — floor sink, mop sink, hand sink, indirect waste — against the riser diagram. The same discipline carries into professional retail and shopping center estimating, where tenant spaces share the shell but rarely share the same fixture count.

Finishes are where the small errors hide. Quarry tile in the dish area, FRP wall panel in the prep room and cove base at every wall base are measured separately because they carry different labor rates and different waste factors. Each estimate is labeled with its AACE estimate class, so you know whether you are holding a Class 3 budget or a Class 2 bid-ready number.

Trade-specific expertise

Division 11 equipment, Division 22 plumbing, Division 23 HVAC and Division 26 electrical are each taken off by an estimator who works in that division daily. Kitchen equipment counts come from the equipment schedule; electrical loads come from the panel schedule and the nameplate data, not from a rule of thumb.

Quality control and clear assumptions

Every workbook carries an assumptions page: code edition assumed, waste factors used, exclusions, and any line priced as an allowance. A second estimator checks quantities against the marked-up drawings before release, and the check is recorded on the summary.

Turnaround, communication and revisions

Delivery dates are agreed in writing when we accept the project, based on sheet count and scope, and confirmed against the bid date you give us. Revisions for addenda or changed equipment schedules are quoted as additional scope, and every revision is issued as a new workbook version so your bid file stays traceable. Questions go to the estimator who measured the sheet, not a call center.

Restaurant Estimating Services Pricing

We do not publish a rate card, because a restaurant set is rarely one size of work. A 4,000 sq ft build-out with a full commercial kitchen, a Type I hood, a walk-in cooler and a grease interceptor carries far more line items than a dining room refresh. Our restaurant estimating services are quoted per project after we read the drawings and confirm the scope. The calculator below turns your own square-foot assumptions into a budget total; it holds no prices and does not set our fee.

How quotes are calculated

The fee follows the work in the documents, not the square footage alone. We count the sheets in the set, the CSI MasterFormat divisions in play, the number of equipment schedules and panel schedules, and the alternates and allowances carried in the bid form. A restaurant plan review estimate built from a complete set with a kitchen equipment schedule and a reflected ceiling plan takes less time than one pieced together from a shell drawing and a tenant criteria letter.

A fixed fee is quoted after plan review, and that review is where scope gaps surface: a missing FRP wall panel schedule, a walk-in cooler shown without its remote condensing unit, a hood without a makeup air unit. Each gap becomes a stated assumption in the quote rather than a surprise later. Send your plans through our quote request and we will confirm the scope before naming a fee.

What affects price and delivery time

Sheet count and trade mix move both numbers. A set that includes Division 11 equipment, Division 22 plumbing, Division 23 HVAC and the fire suppression drawings under one cover takes more takeoff time than a finishes-only package, and addenda issued mid-bid restart the affected sheets. The bid date sets the working window: a firm date lets us sequence the takeoff, while an open date lets us absorb revisions without rework.

Delivery time is confirmed with the quote, and we do not commit to hours or days before the documents are in hand. Revisions, alternates and late addenda extend the schedule; a clean, complete set shortens it. The date we give you is the date we plan to meet, and we say so in writing on the quote.

Square-foot budget calculator

Hard cost
$444,000
Soft costs
$53,280
Contingency
$49,728
Escalation
$21,880
Budget total
$568,888
All-in per sq ft
$237

Enter your own base rate from a recent bid, cost book or estimator. The default values are placeholders for the math, not market prices.

Restaurant Estimating Services Across the US

Wage levels set the labor side of every line, and they differ by region and by project type. Public work such as a school cafeteria or a municipal concession building may carry prevailing wage rates that sit well above the open-shop rate for the same trade. Our pricing starts from national average unit costs and adjusts with published wage data, then an estimator reviews the result against the local market. The wage table below shows the trade rates behind those adjustments.

Material delivery and climate change the numbers too. A mountain or island project carries freight on a walk-in freezer and on stainless steel worktables, and a cold-climate site adds freeze protection to the plumbing scope. Code editions vary by jurisdiction, so a dining room finish takeoff that meets one health department's cove base and floor-wall detail may need revision in the next county. We confirm local amendments where the drawings name them and flag the rest as assumptions. The same regional wage logic applies to professional church and religious building estimating, where fellowship-hall kitchens and commercial hoods follow the same trade rates.

One team serves all 50 states, so the same estimator who reads your kitchen equipment takeoff also reads the structural and MEP sheets. That keeps the assumptions consistent from the hood and duct takeoff through the final cove base count.

BLS OEWS 2025 national median hourly wages for trades common in restaurant construction
TradeNational median hourly wage
Construction laborers$22.66
Carpenters$29.12
Cement masons and concrete finishers$27.41
Electricians$30.38
Plumbers, pipefitters and steamfitters$30.67
First-line supervisors, construction trades$38.42
Cost estimators$37.86

Frequently Asked Questions

How much does a restaurant estimate cost?

The fee is quoted per project after we review the plans. It depends on the drawing set's completeness, the square footage and seat count, how many trades are in scope (Division 11 equipment, Division 22 plumbing, Division 23 HVAC, Division 26 electrical), and whether you need alternates or allowances priced separately. Send the plans and equipment schedule and we return a written quote before any takeoff work starts.

How long does a restaurant takeoff take?

We do not publish a fixed turnaround. The delivery date is set when we quote, based on the sheet count, whether a kitchen equipment schedule and hood schedule are issued, and how many revision cycles you need. We confirm that date in writing with the fee, so you can plan bid leveling around it rather than assume a number.

Do you estimate labor and material costs?

Yes. Material quantities come from the drawings and equipment schedule; labor hours are built from those quantities and priced with national average unit costs adjusted using published U.S. Bureau of Labor Statistics wage data, then reviewed by an estimator. Each line shows the unit, the measurement rule and the arithmetic, so you can see where a labor figure came from.

What drawings do you need?

Architectural, mechanical, plumbing and electrical sheets, plus the equipment schedule and kitchen hood/makeup air schedule if issued. A reflected ceiling plan, finish schedule, millwork details and the health department plan review set help. If only a partial set exists, tell us which sheets are pending so we can flag allowances instead of guessing quantities.

Can you use my estimate template?

Send your template with the plans and we confirm whether the estimate can be delivered in it. We normally deliver an Excel workbook and PDF summary with marked-up drawing pages; if your template's CSI MasterFormat structure and unit columns can hold our takeoff lines, we work in it. We tell you before plan review if it cannot.

Do you sign NDAs?

Clients can request an NDA before sending drawings, and the terms are agreed before plan review begins. Send the draft with your inquiry so the paperwork is settled before files move. We do not publish a standard NDA policy, so the agreement is handled case by case with your document or ours.

Do you price kitchen equipment from the equipment schedule?

Yes. We take off Division 11 equipment line by line from the schedule: ranges, convection ovens, fryers, steamers, conveyor dishwashers, walk-in coolers and freezers, stainless steel worktables, prep sinks and shelving, each counted as an each item with the utility connection noted. Where the schedule is silent on a model, we carry an allowance and mark it as such.

How do you handle hoods, grease ducts and fire suppression?

Type I hoods, grease duct and the Ansul system are taken off by length and each count: hood length in linear feet, duct run in linear feet including elbows and offsets, fan and makeup air unit as each, and suppression system by appliance served. Exhaust CFM and makeup air balance are checked against the mechanical schedule so the HVAC scope matches the hood schedule.

Can you estimate a restaurant build-out from a tenant shell?

Yes. A build-out estimate from a cold shell or second-generation space separates base-building work from tenant scope: demising walls, grease interceptor and floor sinks in Division 22, hood and makeup air in Division 23, panel schedule upgrades in Division 26, and dining room finishes. We list alternates and allowances separately so you can compare bids on the same scope.

Do you break out dining room finishes from the kitchen?

Yes, as separate line groups. Dining room finish takeoff covers quarry tile or hard surface flooring by square foot, FRP wall panel and painted gypsum by square foot, cove base by linear foot, ceiling systems, millwork and ADA restroom fixtures. Keeping front-of-house and back-of-house apart lets you compare a finish upgrade against kitchen equipment value.

What estimate class do your restaurant estimates fit?

Most plan-based restaurant estimates sit at AACE Class 3 or Class 2, depending on design completeness. A set with a full equipment schedule and coordinated MEP supports a tighter class; a schematic layout with allowances is closer to Class 4. We state the class and the basis on the cover sheet so the reader knows how much contingency the number carries.

Do you provide restaurant estimating services in all states?

Yes. We work nationally from drawing sets, so the same takeoff rules apply in every state. Code editions differ: IBC and IRC adoption, NEC edition, IPC or UPC, and local health department requirements for hoods, grease interceptors and restroom counts. Confirm the local editions with the building department; we note where a code-driven quantity depends on that confirmation.

Send Your Restaurant Plans for a Quote

Send the architectural, MEP, and kitchen equipment drawings with any health department comments, and we will review the set and return a written quote with a confirmed delivery date. The finished estimate arrives as an Excel workbook and PDF summary with marked-up drawing pages.

Request a Free Quote