KNRConstructionsSend Plans

Primavera P6 Scheduling Services for Contractors

Primavera P6 scheduling services from KNR Constructions give general contractors, trade contractors and owners a CPM schedule whose logic, calendars and durations you can check line by line. We build, update and audit P6 schedules and deliver an Excel workbook, a PDF summary and marked-up drawing pages so your team can defend every date to the owner.

  • Logic ties, calendars and constraints documented
  • Baseline, update and recovery schedules built in P6
  • Time impact analysis tied to specific fragnets
  • Excel workbook, PDF summary and marked drawings

Upload your plans

Send drawings and a short scope. You get a fixed price before any work starts.

What do Primavera P6 scheduling services include?

Primavera P6 scheduling services cover CPM schedule development, baseline and progress updates, resource and cost loading, delay and time impact analysis, and schedule audits. Each activity carries a work breakdown structure code, calendar, duration and logic ties, and every date is traceable to an input you can review.

Our Professional Primavera P6 Scheduling Services

A Primavera P6 schedule is only as good as the logic and quantities behind it. We build and check both: the CPM network in P6 and the cost and resource values loaded onto it, so every activity carries an arithmetic trail back to a drawing, a specification section or a published price series. Each deliverable states the unit of measure, the rule applied and the source, the same discipline we apply across our CPM scheduling work.

Primavera P6 schedule development starts with the work breakdown structure, then activity codes, calendars and logic ties. We check every predecessor-successor pair for open ends and dangling logic before the file is released as a baseline. Our primavera p6 scheduling services also include quantity takeoff support, so activity durations rest on measured work rather than an estimator's recollection of a similar job.

Quantity takeoffs mapped to activity IDs

We measure the work each activity represents so durations sit on real quantities rather than judgment. Concrete is taken off in cubic yards, formwork in square feet of contact area, structural steel in tons by member mark, and mechanical piping in linear feet by diameter. The takeoff is organized by CSI MasterFormat division and mapped to P6 activity IDs, so a change in the drawings can be traced to the activities it moves.

Crew hours priced from published wage data

Crew sizes and production rates convert quantities into labor hours, and labor hours are priced against published wage data rather than a remembered rate. We show the crew composition, the hours per unit, the wage source and the burden assumption on the same sheet. Material escalations follow the Producer Price Index series for the relevant commodity, so a steel or copper-driven package is not priced on last year's number.

Schedule reconciled to the bid form

For bid work we deliver a schedule that matches the estimate line by line: activity durations, resource loading and cost loading that reconcile to the bid form. The package includes a Gantt chart, a schedule narrative and a submittal register tied to procurement activities. The longest path is identified and labeled, not inferred, so the bid team can defend the duration they priced. To start, send your plans and we will quote the fee after reviewing them.

What Is Included in Our Primavera P6 Scheduling Estimates?

Each engagement is scoped by deliverable, not by hours. Our Primavera P6 scheduling services produce a file you can open, audit and update without us, plus a PDF summary that explains the logic in plain terms. The components below are what we check and what we hand back.

Work breakdown structure, activity codes and logic network

We set up the WBS by phase and area, assign activity codes for responsibility and trade, and build the logic ties that define the critical path method network. Calendars are assigned per activity rather than globally, and constraint dates and lags are logged so a reviewer can see where the logic was overridden. Open ends and dangling logic are listed and closed before the baseline is issued. Teams that hold the file in another tool can pair this work with our MS Project scheduling services without rebuilding the network.

Durations, float values and milestone dates

Every activity carries a duration derived from quantity and crew output, and every path carries total float and free float values. We report the longest path separately from the zero-float path where they differ, and we flag milestones that depend on procurement or submittals rather than field work. The schedule update cycle is defined at the start, with the data date, the reporting period and the percent complete rule stated in the narrative. Primavera P6 schedule development on our side ends with a schedule narrative and Gantt chart a reviewer can follow line by line.

Materials, labor, equipment and cost breakdowns

Resource and cost loading in P6 follows the same breakdown on every project:

  • Labor — crew composition, hours per unit, wage source and burden, priced from published wage data.
  • Materials — quantity, unit, waste allowance and escalation basis, with commodity PPI series named where used.
  • Equipment — equipment class, hourly rate basis and utilization assumption.
  • Cost loading — activity costs rolled to the WBS, with earned value and schedule variance reported each period.
  • As-built schedule — actual start and finish dates recorded against the baseline for closeout and for any later delay analysis.

Who Needs Our Primavera P6 Scheduling Services?

A schedule is a contract document as much as a planning tool. The groups below use the same file for different decisions, and each one needs the logic and the numbers to survive scrutiny. That is the standard we hold every file to when we deliver primavera p6 scheduling services.

Specialty trade subcontractors

Trade contractors use p6 schedule update and maintenance to protect their own windows in a master CPM schedule. We load their labor and material quantities onto their activities, so a float claim or a recovery schedule is backed by hours and units rather than assertion. The same file supports their monthly progress tracking submission to the general contractor, and it is the reason trade firms send us their P6 files.

General contractors and home builders

General contractors need a master schedule that ties subcontractor activities, submittals and procurement into one network. We build the baseline, run the update cycle and issue the look-ahead that the field actually uses. For builders running repeated floor plans, the same logic template is reused across lots with quantities refreshed per plan, which keeps the P6 schedule consistent from lot to lot.

Developers, architects and suppliers

Developers use the schedule to test whether a pro forma opening date is achievable before committing capital. Architects use it to sequence submittal and review cycles against construction activities. Suppliers use it to align fabrication and delivery milestones with the installation dates the schedule assumes.

Types of Primavera P6 Scheduling Projects We Estimate

The scheduling scope changes with the project type, mostly in the number of interfaces and the length of the procurement chain. We adjust the WBS depth, the calendar structure and the reporting cycle to match. Our primavera p6 scheduling services start from the contract milestone dates and the contractor's means and methods, not from a stock template.

Residential projects

Residential work runs on short, repetitive cycles where a single day of lag compounds across dozens of units. We build a template network per plan type, track percent complete by unit, and issue a two-week look-ahead schedule that the superintendent can walk. The critical path method schedule review focuses on inspection and rough-in sequences rather than structural steel.

Commercial buildings

Commercial projects carry long submittal and procurement chains, so the baseline schedule is built around the submittal register and the release dates for switchgear, elevators and curtain wall. We load cost by CSI MasterFormat division so earned value reporting matches the pay application, and the cost basis ties back to our construction cost estimating services. Our CPM network development work covers the update cycle for these projects.

Industrial and infrastructure projects

Industrial and infrastructure work brings phased handovers, long-lead equipment and often a contract-specified AACE estimate class for the cost basis. We build the network around area and system turnover, and we keep the as-built record current so time impact analysis can be run on a fragnet without rebuilding the file. The schedule narrative documents the basis for each phase, and the same primavera p6 scheduling services carry through to closeout.

Our Primavera P6 Scheduling Estimating Process

We build the schedule estimate the same way we build a cost estimate: from the documents, in a fixed sequence, with a check at each step. The output is a priced scope for primavera p6 scheduling services — the labor hours and fee tied to building the work breakdown structure, setting logic ties, and running the baseline schedule and progress tracking cycle. Every rate on the sheet carries its source.

You send the drawings, specifications, and any existing schedule file or owner milestone dates. We log what we received, flag missing sheets, and confirm the schedule basis before any hours are counted. Where the file already shows slippage, the same review feeds the professional schedule delay and time impact analysis that prices fragnet work separately.

  1. Submit drawings and specifications

    Send the full drawing set by CSI MasterFormat division, the specifications, the owner's milestone dates, and any prior schedule or phasing plan. We log the receipt date and the sheet list, then note what is missing — a structural set without the foundation details will change the activity count. The review confirms the project scope and the schedule basis before we price any hours.

  2. Plan review and digital takeoff

    We read the plans for activity count, sequencing, and procurement lead items, then set the work breakdown structure and the level of detail the schedule needs. The takeoff captures quantities per activity so resource loading and cost loading have a measured basis rather than an allowance. Missing information goes on a query list rather than into an assumption buried in a cell.

  3. Cost calculation, quality checks and delivery

    Hours are priced from national average rates adjusted with published U.S. wage data, then reviewed by an estimator. A second pass checks activity counts, calendar assignment, and milestone dates against the drawings and the owner's requirements. The workbook and PDF summary go out with the marked-up pages, and the fee is quoted per project after we review the plans — send your plans to start.

Sample Primavera P6 Scheduling Estimate and Deliverables

The illustrative example below prices a schedule development and maintenance scope for a 42,000 sq ft two-story office building, assuming a 14-month construction duration, a 900-activity P6 schedule, monthly updates, and one owner-driven revision cycle. Hours are illustrative and the arithmetic is shown so you can check it. In practice, resource and cost loading in p6 is priced per activity, so activity count drives the fee more than project value does.

Activity codes and calendar assignment are set up once and reused across every update, which is why we price them as a one-time line rather than per cycle. The table shows the line items, quantities, and extended ranges.

Illustrative schedule development and maintenance estimate — 900-activity P6 schedule, 14-month duration
ItemQtyUnitUnit cost rangeExtended range
Work breakdown structure and activity codes setup900activity$0.60 – $0.90$540 – $810
Logic ties, calendars and constraint dates900activity$0.50 – $0.80$450 – $720
Resource and cost loading in P6900activity$0.70 – $1.10$630 – $990
Baseline schedule narrative and review1lump sum$1,200 – $1,800$1,200 – $1,800
Monthly schedule update and progress tracking14month$850 – $1,300$11,900 – $18,200
Recovery schedule revision1lump sum$1,500 – $2,400$1,500 – $2,400
Total (illustrative)———$16,220 – $24,920
  • Excel quantity takeoff sheet

    The workbook carries one row per activity with quantity, unit, crew or resource, duration, and predecessor successor logic. Activity codes for phase, area, and responsible party sit in their own columns so the schedule can be filtered and sorted without rework. Cost loading is carried on a separate tab keyed to the same activity IDs.

  • Marked-up drawings

    The drawing set comes back with the takeoff areas, activity zones, and phasing boundaries marked, so you can trace any activity quantity back to a sheet and a dimension. Procurement and long-lead items are flagged on the sheets where they first appear.

  • Itemized cost estimate

    Each line shows the unit, the measurement rule, the hours, the rate, and the arithmetic, with the source noted. Totals roll up by phase and by CSI MasterFormat division so the schedule scope can be compared against the cost estimate. The fee is quoted per project after plan review — request a quote with your drawings.

Software and Pricing Data We Use

Schedule scopes are priced from measured activity counts, not from a percentage of construction value. When a schedule delay analysis and time impact is part of the scope, the fragnet activities are counted the same way and priced per activity. The chart below shows the Producer Price Index series for the materials in this scope, rebased to 100, so you can see how input costs have moved.

The wage table below shows the BLS national median hourly wages behind the labor rates on our sheets. Those rates feed the labor cost estimates that sit under each activity's duration and crew loading.

Takeoff and estimating software

We work in PDF and on-screen takeoff tools for quantity capture, spreadsheet estimating workbooks for the rate build-up, and published cost databases for cross-checks. Schedule logic is reviewed for dangling logic, open ends, and constraint date conflicts before any hours are priced. The tool category matters less than the audit trail, so every line carries its source.

Regional material and labor pricing method

We start from national average unit costs and adjust them with published U.S. wage and price data for the project location, prevailing wage requirements, and project conditions. The chart below tracks the material index movement and the wage table below carries the trade rates we adjust from. Earned value and schedule variance reporting are priced as separate update lines when the contract requires them.

Material price movement, Oct 2023 to Sep 2026

85118150Oct 2023Sep 2026
Lumber and wood products: +14.6%Ready-mix concrete: +6.3%Steel mill products: +27.8%Copper wire and cable: +47.5%
Index rebased to 100 at Oct 2023. Source: U.S. Bureau of Labor Statistics, Producer Price Index (WPU081, WPU1333, WPU1017, WPU102502), updated 2026-10-25.
U.S. hourly wages for the trades in this scope (latest BLS release)
Occupation25th percentileMedian75th percentile
Construction laborers$18.57$22.66$28.72
Carpenters$23.32$29.12$36.94
Electricians$23.76$30.38$40.36
Plumbers, pipefitters and steamfitters$24.13$30.67$40.92
Cement masons and concrete finishers$22.60$27.41$32.15
First-line supervisors, construction trades$30.48$38.42$48.78
Cost estimators$29.40$37.86$48.97

Base wages before payroll taxes, insurance and benefits. Source: BLS Occupational Employment and Wage Statistics, national, all industries.

Why Contractors Choose Our Estimating Services

A p6 schedule for general contractors is only useful if the hours behind it can be defended in a meeting. We price schedule work by activity count and update cycle, so the number on the sheet matches the work in the file. The logic is reviewed for predecessor successor correctness and for lag values that quietly stretch durations.

Every assumption sits on the sheet in plain language. If we assume a 10-day cure period or a 30-day submittal review, you see it, and you can change it. Where the schedule carries cost, we tie the resource and cost loading back to the same unit costs used in our professional construction estimating services, so the earned value figures reconcile to the estimate.

Trade-specific expertise

Schedule development follows the trade sequence: foundations before steel, rough-in before close-in, and commissioning after substantial completion. We read the specifications for submittal register items and long-lead procurement so those activities appear on the schedule with real duration rather than a placeholder. Schedule variance is reported against the baseline, not against a moving target.

Quality control and clear assumptions

A second estimator checks activity counts, calendar assignment, and milestone dates against the drawings and the owner's requirements. Assumptions are listed on the cover tab with the source document named. Any open item is flagged rather than buried in a cell.

Turnaround, communication and revisions

The delivery date is agreed in writing when we accept the scope, based on the drawing set size and the activity count. Revisions are handled as a defined cycle with a written query list, so each round has a clear input and output. The fee is quoted per project after we review the plans — send your plans and we will confirm the scope and the date.

Primavera P6 Scheduling Services Pricing

We quote a fixed fee per project after reviewing the plans, the specification and the schedule requirements. There is no rate card, because two projects of the same size can differ by an order of magnitude in logic density, calendar count and reporting depth. Send the drawings, the draft schedule and the bid date through send your plans and the fee comes back with the scope of work written out line by line.

The calculator below is a budget tool, not our fee schedule. You enter the building area, your own base hard cost per square foot, soft-cost percentage, contingency percentage and escalation percentage; it returns hard cost, soft costs, contingency, escalation, budget total and all-in cost per square foot. It carries no prices of its own and no building-type picker, so the base cost is always yours. Use it to frame the project budget the schedule has to serve, then treat the scheduling fee as a separate line item.

Schedule scope drivers that move the quoted fee
Scope driverWhat we countWhy the fee moves
Activity countActivities in the work breakdown structureLogic density and review time scale with activity count
CalendarsCalendar assignments in P6Multiple calendars require per-activity verification
Activity codesCode dictionary depthSorting and grouping for reports takes setup time
Logic qualityDangling logic and open endsEach defect is traced to a predecessor or successor
Float targetsTotal float thresholds by milestoneDrives logic revisions before the baseline is accepted
ReportingUpdate cycles and s-curve outputMonthly update and maintenance is priced per cycle
Delay workFragnets for time impact analysisEach fragnet needs records and its own logic

How quotes are calculated

The quote is built from the schedule scope, not from a square-foot multiplier. We count the activities in the work breakdown structure, the number of calendar assignments, the activity codes and the reporting cycles the owner requires, then price the labor to build, review and maintain that model. A baseline with 400 activities and one calendar is a different job from a 4,000-activity model with six calendars, resource loading in P6 and monthly earned value reporting.

For a client bidding federal or state work, the quote also covers the specification-driven deliverables: schedule narrative, submittal register tie-in, cost loading, and a review pass that closes dangling logic and open ends before submission. When the scope includes a time impact analysis, we price the fragnet development separately because each fragnet needs its own logic and its own contemporaneous records.

What affects price and delivery time

Sheet count and trade count drive both the fee and the calendar. A set with full architectural, structural, mechanical, electrical and plumbing sheets takes longer to convert into a work breakdown structure than a shell package, and each trade brings its own activity codes and its own productivity assumptions. Alternates and addenda add passes: every addendum issued after the baseline is frozen forces a logic review and a re-issue of the affected activities.

Delivery time is confirmed with the quote, and the bid date is the hard constraint we work back from. A clean set issued once with a firm bid date is the shortest path; a set re-issued three times, or one where the owner's scheduling specification arrives after the drawings, is the longest. Total float targets, constraint dates and mandated milestone calendars all add review cycles. We do not publish hours or days until the plans are in hand.

Square-foot budget calculator

Hard cost
$444,000
Soft costs
$53,280
Contingency
$49,728
Escalation
$21,880
Budget total
$568,888
All-in per sq ft
$237

Enter your own base rate from a recent bid, cost book or estimator. The default values are placeholders for the math, not market prices.

Primavera P6 Scheduling Services Across the US

KNR serves all states from one team, so the method does not change at a state line; the inputs do. Wage levels differ by region, and public work adds prevailing wage requirements that shift the labor cost loaded into each activity. Material delivery windows differ too, and a long steel or switchgear lead time becomes a procurement activity with its own float rather than an assumption buried in a crew duration.

Climate and code editions change the sequence. A northern project carries weather-sensitive activities and winter shutdown constraints; a coastal project carries wind and flood provisions from the locally adopted code edition, which you should confirm with the building department. Those differences show up in calendar assignment and in constraint dates, not in the pricing model.

We apply the same p6 schedule audit and validation to every region: every activity traced to a predecessor and successor, free float and total float reviewed against the owner's thresholds, open ends closed, and logic checked against the as-built record. Where a delay has occurred, the delay analysis follows the same evidence standard regardless of jurisdiction. Our CPM scheduling practice page describes the wider scope these Primavera P6 scheduling services sit inside.

Frequently Asked Questions

How much does a primavera P6 scheduling estimate cost?

The fee is quoted per project after we review the plans and the scheduling scope. It depends on activity count, number of calendars and activity codes, whether the baseline needs resource and cost loading, the update frequency, and how many delay fragnets you need. Send the drawings and any existing schedule file, and the quote states the fee and what the deliverable covers.

How long does a primavera P6 scheduling takeoff take?

The delivery date is set by the activity count, the drawing set's completeness, and how many review cycles the baseline needs. We confirm it in the quote rather than quoting a standard turnaround. Missing specifications, unresolved RFIs, and late trade input push the date, so send the fullest set you have and flag what is still pending.

Do you estimate labor and material costs?

Yes. Activity durations come from production rates, and the cost-loaded P6 schedule carries labor hours and material quantities against the same activities. Wage inputs follow published U.S. Bureau of Labor Statistics data and material pricing follows Producer Price Index movement, so the loaded cost ties back to a stated source rather than a round number.

What drawings do you need?

Send the architectural, structural, MEP, and civil sheets at the latest revision, the specification sections, the geotechnical report, and the owner's milestone dates. A prior schedule file, a phasing plan, and the general conditions help. If only a partial set exists, we schedule what is documented and list the open items as placeholders.

Can you use my estimate template?

Send the template with the plans and we confirm whether the estimate can be delivered in it. We match your activity ID convention, WBS levels, activity codes, and calendar naming where the template supports them. If a field cannot be carried through, we say so before the work starts rather than after delivery.

Do you sign NDAs?

Clients can request an NDA before sending drawings, and the terms are agreed before plan review begins. Send the draft with your request so the scope, permitted use, and return of documents are settled up front. We do not publish a standard NDA policy, so each agreement is handled on its own terms.

What is included in your primavera p6 scheduling services?

Our primavera p6 scheduling services cover baseline development, logic and calendar review, resource and cost loading, monthly updates, time impact analysis, and schedule audits. Each deliverable ships as an XER file, an Excel workbook, a PDF summary, and marked-up drawing pages so every activity traces to a sheet and a measurement rule.

Can you build a CPM schedule from drawings only, without a prior schedule?

Yes. We build the work breakdown structure from the CSI MasterFormat divisions in the drawing set, then sequence activities with predecessor and successor ties and assign calendars. The result is a logic-driven critical path method schedule with total float and free float reported, not a bar chart drawn by hand.

How do you handle schedule updates and progress tracking?

Each update cycle takes the field percent complete by activity, recalculates the longest path, and compares the result to the baseline. We report schedule variance and earned value where cost is loaded, and we flag constraint dates and out-of-sequence progress that distort the float picture.

What does a schedule delay analysis include?

A time impact analysis inserts a fragnet for the delay event into the accepted baseline, runs the calculation, and reports the shift in the completion milestone. The output names the affected activities, the driving logic, and the float consumed, which is what a claim or a change order negotiation needs.

Do you review schedules built by another party?

Yes. A p6 schedule audit and validation checks dangling logic, open ends, excessive lags, hard constraints, calendar mismatches, and missing submittal register ties. We return a written schedule narrative of findings with the corrected file, so the review is defensible in a progress meeting.

Can the schedule tie to my cost estimate?

Yes. Resource and cost loading in p6 assigns labor hours and material values to activities, so the schedule and the estimate share one quantity basis. That link supports earned value reporting and lets a change in quantity flow through to both the budget and the completion date.

Do you work with general contractors across the US?

We serve general contractors, trade contractors, owners, and developers in all U.S. states. Files are delivered remotely, and the schedule narrative explains the assumptions so a superintendent or project manager can read the logic without opening P6.

Which P6 file formats do you deliver?

We deliver an XER export for import into P6, an Excel workbook with the activity table, logic, and loadings, a PDF summary with the Gantt chart and S-curve, and marked-up drawing pages. The XER is the working file; the workbook and PDF are the review copies for parties without P6 access.

Send plans for a P6 schedule quote

Send the construction document set, the schedule specification and any existing P6 or Excel schedule file. We review the drawings, confirm the activity scope and delivery date with the quote, and return a cost-loaded baseline schedule with the logic and data sources documented.

Request a Free Quote