KNRConstructionsSend Plans

Swimming Pool Estimating for Contractors

Swimming pool estimating services for general contractors, pool builders and developers who need quantities they can defend. We take off excavation, shell, plumbing, electrical and equipment from your drawings and return an Excel workbook, a PDF summary and marked-up drawing pages, so your bid shows where every number came from.

  • Gunite, fiberglass and vinyl liner scopes
  • Excavation, shell, plumbing, electrical and equipment
  • Excel workbook with PDF summary
  • Marked-up drawing pages for each line

Upload your plans

Send drawings and a short scope. You get a fixed price before any work starts.

What does swimming pool estimating deliver?

Swimming pool estimating produces measured quantities and priced lines for excavation, shell, plumbing, electrical, equipment and finishes, delivered as an Excel workbook, a PDF summary and marked-up drawings. Each line shows its unit, measurement rule and arithmetic so a contractor can check it before bidding.

Our Professional Swimming Pool Estimating

Pool work fails on the sheet long before it fails in the ground. A gunite shell is priced from a rebar cage, a shell thickness that varies by wall and floor, and a plaster finish measured in square feet of waterline surface — not from a single lump sum per pool. Our swimming pool estimating follows the same rule as every other trade we price: each number carries its unit, its measurement rule and its source. The same discipline applies across trades, and our concrete estimates support the shell, coping and deck lines with the same unit-and-rule backup, just as structural steel estimates support the rebar cage by bar size and weight.

We work from your plan set, structural details, equipment schedule and finish schedule. Where a dimension is missing, we mark the assumption on the drawing page rather than burying it in a cell. That is what makes swimming pool takeoff services useful at bid time instead of just at closeout.

Swimming Pool material takeoffs

We measure the shell in cubic yards of gunite or shotcrete, the rebar cage in linear feet by bar size and the excavation in bank cubic yards including over-excavation for the shell and plumbing trench. Finish quantities run in square feet: waterline tile, plaster finish, coping and decking. The deliverable is a line-item takeoff workbook where every quantity traces back to a drawing sheet and a stated measurement rule, plus marked-up pages showing where each dimension came from.

Swimming Pool labor cost estimates

Labor is built by crew and task: excavation and grading, steel tying, shooting and finishing the shell, plumbing rough-in, electrical rough-in, finish application and equipment set. Hours are priced against published wage data for operating engineers, cement masons and construction laborers, then reviewed by an estimator who knows how a pool crew actually sequences a dig. You see the hours, the rate basis and the labor subtotal separately from material.

Bid-ready swimming pool cost estimates

The final package is an Excel workbook and a PDF summary with marked-up drawings. Material, labor and equipment sit in separate columns, sales tax and waste are shown as their own lines, and the bonding grid and other Division 13 special construction items are carried where they belong. The fee is quoted per project after we review the plans, so send your plans and we will confirm scope before any pricing starts.

What Is Included in Our Swimming Pool Estimates?

A pool estimate is only as good as its item list. We break the scope by CSI MasterFormat division so nothing lands in a general conditions catch-all: Division 31 earthwork for excavation and backfill, Division 22 plumbing for the circulation system, Division 26 electrical for feeders and controls, Division 13 special construction for the pool structure and equipment package. Swimming pool estimating starts with the structural detail, not the sales brochure. Our trade estimating services cover the shell, plumbing and electrical scopes as separate packages so each one can be bid or value-engineered on its own. When a renovation scope includes removing an existing shell, deck or equipment pad, our demolition estimating services price the removal and haul-off as its own package before the new work is measured.

Illustrative takeoff lines for a gunite pool (quantities illustrative only)
Line itemUnitMeasurement ruleDivision
Excavation and over-excavationcubic yardPlan area × depth + 1 ft over-dig each side31 00 00
Gunite shellcubic yardSurface area × shell thickness by zone13 00 00
Rebar cagepoundBar length × unit weight by bar size03 20 00
Plumbing rough-in, Schedule 40 PVClinear footDeveloped length by diameter22 00 00
Bonding grid and groundinglinear footPerimeter + equipment runs26 00 00
Plaster finishsquare footWetted surface area13 00 00
Coping and waterline tilelinear footPool perimeter09 30 00
Decking and expansion jointssquare footDeck area net of pool opening32 00 00

Excavation, shell, plumbing and equipment

  • Excavation, over-excavation and haul-off in cubic yards, with spoil volume and diesel exposure called out
  • Shotcrete or gunite shell in cubic yards by thickness zone, with the rebar cage in linear feet and pounds
  • Plumbing: skimmer, main drain, return line, autofill line and hydrostatic relief valve, measured in linear feet of Schedule 40 PVC by diameter
  • Electrical: pump circuit, bonding grid and equipotential bonding conductors, plus the gas line to the heater
  • Finishes: waterline tile, plaster finish, coping, decking and expansion joints in square feet
  • Equipment schedule: pool pump, cartridge filter, salt chlorinator, heater, handrail and diving board

Cubic yards, square feet and linear feet by item

Every line carries one unit and one rule. Shell volume is plan area times average depth times thickness, adjusted for wall batter. Plaster finish is measured on the wetted surface, not the plan footprint. Coping and waterline tile run in linear feet along the perimeter. Decking is square feet net of the pool opening. The workbook shows the formula behind each quantity so a reviewer can re-derive it in a minute, which is what separates a usable pool quantity takeoff Excel file from a lump-sum guess.

Materials, labor, equipment and cost breakdowns

Each line splits into material, labor and equipment. Material is priced at a national average unit cost and adjusted with published U.S. wage and price data, including ready-mix concrete and plastic construction products, then reviewed by an estimator. Labor shows hours times a wage basis. Equipment covers the excavator, concrete pump and dewatering gear as separate line items rather than a percentage.

Who Needs Our Swimming Pool Estimating?

Different readers need different slices of the same sheet. A pool subcontractor needs the shell and equipment quantities to price a bid; a home builder needs a fiberglass pool cost estimate that lines up with the site package; a developer needs the decking and hardscape carried consistently across lots. We produce one workbook that serves all three, and estimating at that level means every line carries its unit, measurement rule and source.

Pool and concrete subcontractors

You are bidding against two or three other pool contractors on the same drawings. The rebar cage, shell thickness and main drain layout decide the number. We give you the quantities by division so you can adjust your own crew rates and markups without rebuilding the takeoff, and you can compare your historical costs against a line-item basis. Our quantity takeoff support keeps the gunite shell, excavation and plumbing lines separated so each one can be re-priced on its own.

General contractors and home builders

A pool sits inside a larger scope, and the interface is where budgets slip: decking elevations, the gas line to the heater, the electrical feeder from the house panel. We price the pool package and flag the tie-in points so your sitework and electrical trades carry the right allowances. Our construction cost estimating services carry the same traceable format for the rest of the house, and the pool package follows the same rule of showing the arithmetic behind each line.

Developers, architects and suppliers

Developers use the workbook to compare pool options across a community and to check that decking and coping quantities scale with lot count. Architects use the marked-up pages to confirm that specified finishes and equipment appear in the cost. Suppliers can read the equipment schedule quantities directly. Our professional trade estimating services cover the adjacent trades on the same site, and a multi-lot community keeps the same line structure from lot to lot.

Types of Swimming Pool Projects We Estimate

Pool scope changes sharply by building type, and the takeoff has to change with it. A residential gunite pool and a commercial natatorium share a pump and a filter but almost nothing else in structure, code path or documentation. Our swimming pool estimating prices each type against the drawings and specifications that govern it.

Residential projects

Residential work is gunite, fiberglass or vinyl liner, usually with paver coping and a small equipment pad. Pool equipment takeoff covers the pump, cartridge filter, salt chlorinator and heater, plus the gas line and the autofill line. Shell thickness and finish selection drive the cost more than the equipment package does. Code editions vary by jurisdiction, so confirm the local IRC or IBC adoption with the building department.

Commercial buildings

Hotels, fitness centers and municipal pools add commercial pool construction estimate scope: surge tanks, gutter systems, commercial-grade filtration, deck drains and ADA access. Return line and main drain layouts are engineered, and the electrical package grows with controls and emergency shutoffs. We price from the mechanical and electrical drawings, not from a residential template.

Industrial and infrastructure projects

Treatment basins, fire-water reservoirs and process tanks borrow pool methods but follow different standards. Shotcrete thickness, waterstops and hydrostatic relief are specified rather than assumed, and earthwork quantities can dominate the estimate. Our sitework estimating services cover the excavation and grading side, our masonry estimating services cover block and stone pool structures, and our demolition estimating services handle removals when an existing structure is replaced.

Our Swimming Pool Estimating Process

We run every pool package through the same three gates: a plan review, a measured takeoff, and a priced and checked estimate. The sequence matters because a gunite shell cannot be priced before the excavation depths, wall thicknesses and rebar schedule are read off the sections. Send the architectural, structural and pool equipment drawings together with the specifications and the site plan showing the existing grade.

We takeoff to CSI MasterFormat divisions so the numbers land where your bid form expects them: Division 31 Earthwork for excavation and backfill, Division 13 Special Construction for the pool shell and equipment package, Division 22 Plumbing for the suction and return runs. A commercial pool construction estimate also carries Division 26 electrical for the bonding grid and Division 32 for decking and paving. Where the pool ties into site grading, utility runs or storm drainage, we hand the earthwork quantities to the same team that builds our civil estimates, so cut and fill are counted once, and shell concrete volumes are checked against the same rules we apply to concrete estimates.

  1. Submit drawings and specifications

    Send the pool plan, shell sections, equipment schedule, plumbing riser diagram and the geotechnical report if one exists. Note the water type (gunite, shotcrete, fiberglass shell or vinyl liner), the coping and finish selections, and whether a spa, slide or diving board is in scope. Missing sheets are listed back to you before measuring starts, so the takeoff is never built on a guess.

  2. Plan review and digital takeoff

    We scale the plan on screen, set the measurement rules (centerline for pipe, outside face for shell concrete, net area for finishes) and log every quantity with its source sheet. Rebar is counted by bar mark and diameter from the cage detail; schedule 40 PVC is measured by linear foot per size with fitting counts. Excavation is computed from the shell envelope plus working space, and any over-excavation or unsuitable soil is flagged as a separate line rather than buried in the shell price.

  3. Cost calculation, quality checks and delivery

    Quantities are priced against national average unit costs adjusted with public wage and material data, then reviewed by an estimator who checks the shell volume, the pipe lengths and the finish areas against the drawings. We reconcile the expansion joint and deck perimeter against the coping length, since a mismatch there is the most common takeoff error. The workbook, PDF summary and marked-up drawings are delivered together; the fee is quoted per project after we review the plans.

Sample Swimming Pool Estimate and Deliverables

The example below is illustrative and uses assumed quantities and assumed unit costs; it is not a price for your project. Assume a 16 ft by 32 ft rectangular gunite pool, 4 ft to 8 ft depth, 6 in average shell thickness, a 3 ft concrete deck on three sides, and a single pump-and-filter equipment set. The pool excavation and shell takeoff gives 24 cu yd of shell concrete (16 × 32 × 0.5 ft = 256 cu ft ÷ 27 = 9.48 cu yd, plus walls, floor slope and bond beams to reach 24 cu yd) and 14 cu yd of excavation including working space and 2 ft of over-excavation at the deep end. The equipment package lists one pool pump, one cartridge filter, a heater with gas line, a salt chlorinator and a hydrostatic relief valve in the floor.

Every line carries its unit, the measurement rule used, and the arithmetic in a formula column, so a reviewer can retrace any extended cost from the quantity back to the drawing sheet.

Illustrative pool estimate lines — assumed quantities and assumed unit costs, not a project price
ItemQtyUnitUnit cost range (USD)Extended range (USD)
Excavation, including 2 ft over-excavation at deep end14cu yd$65 – $95$910 – $1,330
Gunite shell, 6 in average, rebar cage included24cu yd$525 – $675$12,600 – $16,200
Schedule 40 PVC plumbing, suction and returns180linear ft$9 – $14$1,620 – $2,520
Equipment set: pump, cartridge filter, heater, salt chlorinator1lot$4,800 – $7,200$4,800 – $7,200
Hydrostatic relief valve, floor1each$120 – $180$120 – $180
Waterline tile64sq ft$18 – $28$1,152 – $1,792
Coping and expansion joint96linear ft$32 – $48$3,072 – $4,608
Concrete deck, 3 ft wide on three sides144sq ft$14 – $22$2,016 – $3,168
Total$26,290 – $36,998
  • Excel quantity takeoff sheet

    The workbook holds one tab per trade with columns for item, unit, quantity, measurement rule, drawing reference and extended cost. Quantities are live formulas, so changing a shell thickness or a deck width recalculates the affected lines. This is the pool quantity takeoff Excel file your estimator can drop into an existing bid workbook.

  • Marked-up drawings

    Each drawing page is returned with the measured areas, pipe runs and rebar counts highlighted and numbered to match the takeoff rows. The shell sections show the thickness assumed at each point, and the plumbing plan shows each suction and return run colored by size. Reviewers can see exactly where a quantity came from.

  • Itemized cost estimate

    The PDF summary groups costs by CSI division and shows material, labor and equipment separately, with the assumptions listed at the front. Alternates such as a vinyl liner instead of plaster, or a diving board instead of a handrail, are priced as separate lines so you can compare scope without rebuilding the estimate.

Software and Pricing Data We Use

Pool pricing moves with three inputs you can watch in public data: fuel for excavation, ready-mix for the shell, and plastic construction products for pipe, fittings and equipment housings. The chart below rebases the relevant Producer Price Index series to 100 so you can see which input is moving before you commit a bid. We read those movements into the unit costs rather than holding last year's numbers.

Takeoff and estimating software

We measure on screen from the PDF drawings in a takeoff tool that stores each quantity with its source sheet, then price in a spreadsheet estimating model tied to a cost database. Pipe runs, rebar counts and finish areas are entered as formulas, not typed totals, so the arithmetic is auditable. Pool plumbing and electrical estimating benefits most from this: a mis-keyed return line or bonding conductor length shows up immediately when the extension is a formula. The same discipline carries into structural steel estimates for pool buildings, canopies and equipment supports, where member weights are extended from the same drawing set.

Regional material and labor pricing method

We start from national average unit costs, then adjust for the local wage market using the BLS wage table below and for material movement using the Producer Price Index series in the chart. Prevailing wage projects, remote sites and winter schedules carry their own adjustments, stated as assumptions on the estimate. The same method prices a fiberglass shell set against a gunite pool, a cartridge filter against a sand filter, and an autofill line as its own plumbing item. Confirm local code editions, including the bonding and barrier requirements, with the building department.

Material price movement, Oct 2023 to Sep 2026

65118170Oct 2023Sep 2026
No. 2 diesel fuel: +65.7%Ready-mix concrete: +6.3%Plastic construction products: +3.2%
Index rebased to 100 at Oct 2023. Source: U.S. Bureau of Labor Statistics, Producer Price Index (WPU1333, WPU057303, WPU0721), updated 2026-10-25.
U.S. hourly wages for the trades in this scope (latest BLS release)
Occupation25th percentileMedian75th percentile
Cement masons and concrete finishers$22.60$27.41$32.15
Plumbers, pipefitters and steamfitters$24.13$30.67$40.92
Operating engineers and equipment operators$23.40$28.78$37.10
Construction laborers$18.57$22.66$28.72

Base wages before payroll taxes, insurance and benefits. Source: BLS Occupational Employment and Wage Statistics, national, all industries.

Why Contractors Choose Our Estimating Services

A residential pool bid estimate fails for predictable reasons: the excavation quantity ignores over-excavation, the equipment package is priced as a lump, or the deck perimeter is measured without the expansion joint. We price each of those as its own line with a stated rule, so a losing bid can be diagnosed line by line. When a renovation package includes a shell removal, we bring in professional demolition estimating services to price the saw-cutting, haul-off and disposal as separate lines rather than burying them in the excavation total.

Trade-specific expertise

Pool work crosses earthwork, concrete, plumbing and electrical, and we take off each in its own units and division. A vinyl liner package is measured by wall area and liner perimeter, not by shell volume, and a salt chlorinator is a separate equipment line from the pump and filter. Accessories such as a diving board or handrail are counted by each with their anchors and blocking. Where the scope overlaps adjacent trades, our trade estimating services keep the split clean, and coping and deck borders go to professional masonry estimating services when the unit masonry is set in mortar rather than cast.

Quality control and clear assumptions

Every estimate carries an assumptions page: shell thickness, excavation depths, soil conditions, water table, and the code edition assumed. A second estimator checks the shell volume against the sections and the pipe lengths against the riser diagram before release. Any quantity we could not confirm from the drawings is listed as an open item rather than priced silently.

Turnaround, communication and revisions

Delivery dates are agreed when we accept the project, based on the sheet count and the number of pool types in the package. Questions during the takeoff go to you in one list rather than a stream of emails. Revisions from addenda or a changed equipment schedule are handled as a scoped update, and the revised workbook replaces the earlier version so there is only one live file. Send your plans to start the review.

Swimming Pool Estimating Pricing

The fee for swimming pool estimating is quoted per project after we review the plan set, not published as a rate per sheet. A gunite pool with a separate equipment schedule, deck package and retaining wall takes more review than a single-sheet fiberglass replacement, and the quote reflects that difference. Send drawings and specifications through send your plans and we return a fixed fee tied to the scope we can see.

Our pricing method starts with national average unit costs, then adjusts labor with published U.S. Bureau of Labor Statistics wage data and materials with the Producer Price Index series for ready-mix concrete, plastic construction products and diesel fuel. Each line on the pool quantity takeoff Excel workbook carries its unit, measurement rule and source, so a reviewer can re-add the column and reach the same total.

Inputs that move a swimming pool estimating fee
InputLow review effortHigh review effortWhy it matters
Plan sheets1 architectural sheetArchitectural, structural, MEP and site sheetsEach discipline adds a takeoff pass
Vessel typeFiberglass shell with factory specGunite with rebar cage and shotcrete scheduleShell quantities need thickness and cage spacing rules
EquipmentPump, filter, heater listed by modelFull schedule with gas line, salt chlorinator and controlsModel-level pricing requires catalog lookups
FinishesStandard plasterWaterline tile, stone coping, decking patternsArea takeoffs multiply with pattern and waste
AddendaNoneTwo or more issued after review startQuantities must be re-run against revised sheets
Bid dateOpenFixed and closeCompresses internal check time

How quotes are calculated

We count the sheets, the CSI MasterFormat divisions touched (Division 31 earthwork, Division 22 plumbing, Division 26 electrical, Division 13 special construction for the vessel), the number of alternates and addenda, and whether the scope includes demolition of an existing shell. A residential pool bid estimate with one plan sheet and a standard equipment list sits at the low end; a commercial pool construction estimate with structural, mechanical and life-safety sheets sits at the high end. The fee is fixed once that review is complete.

The calculator below is a budget tool, not our fee. You enter building area, your own base hard cost per square foot, soft-cost percentage, contingency percentage and escalation percentage; it returns hard cost, soft costs, contingency, escalation, budget total and all-in cost per square foot. It holds no prices of its own and no building-type selector, so the numbers it returns are only as good as the base cost you type in.

What affects price and delivery time

Scope drives both. Extra sheets, a full equipment schedule, alternate finishes (paver coping versus cast-in-place), and addenda issued close to the bid date all extend the review. So does a mixed package where the pool, the pool house and the site utilities are drawn by different consultants, because quantities have to be reconciled across disciplines.

Delivery time is confirmed with the quote, and we do not quote hours or days before the plans are in hand. If your bid date is fixed, say so when you request a quote so the schedule can be checked against the sheet count. A tight bid date with a clean, complete set is workable; the same date with four addenda and a missing equipment schedule is not, and we will tell you that before you commit.

Square-foot budget calculator

Hard cost
$444,000
Soft costs
$53,280
Contingency
$49,728
Escalation
$21,880
Budget total
$568,888
All-in per sq ft
$237

Enter your own base rate from a recent bid, cost book or estimator. The default values are placeholders for the math, not market prices.

Swimming Pool Estimating Across the US

Wage levels differ by region, and they move the labor half of a pool takeoff more than most contractors expect. Operating engineers run the excavation, cement masons finish the shell and deck, and laborers handle rebar handling and backfill; each has its own published wage rate, and a pool built in a high-wage metro carries a different labor line than the same pool in a rural county. On public work, prevailing wage determinations override the market rate and must be applied to the same hours.

Material delivery and climate change the quantities as well. Ready-mix concrete pricing shifts with distance from the plant, and diesel fuel moves the cost of hauling spoil off site, where over-excavation is measured in cubic yard. Cold-climate pools add freeze protection, deeper frost footings and heater sizing for a shorter season; hot-climate pools add shading and higher evaporation allowances on the autofill line. Local code editions govern bonding grid details, barrier heights and gas line clearances, so confirm the adopted edition with the building department before pricing.

Our swimming pool estimating team works from one national bench and serves all states, applying regional wage and material adjustments to the same measurement rules, and our professional construction estimating services carry that same traceable method into the rest of the building package. For the earthwork and utility side of a pool package, our sitework estimating services cover the excavation, backfill and utility trenches that feed the pool plumbing and electrical scope. Pool renovation estimating follows the same path, with demolition of the existing waterline tile and plaster added as a separate line before new finishes are counted.

Frequently Asked Questions

How much does a swimming pool estimate cost?

The fee is quoted per project after we review the plans, so it depends on pool type, sheet count, and how many takeoff lines you need priced. Gunite shells with full equipment and plumbing schedules take more review than a fiberglass shell set with a standard package. Send the drawings and we confirm the fee and scope in writing before work starts.

How long does a swimming pool takeoff take?

The delivery date is set when we quote, based on drawing completeness and the scope of the takeoff. A full set with structural, plumbing, and electrical sheets moves faster than a package missing details, because we have to send questions back. We confirm the date with the quote rather than publishing a standing turnaround.

Do you estimate labor and material costs?

Yes. Material quantities come from the drawings, and labor hours are priced from published wage data for the trades that build the pool, then reviewed by an estimator. Excavation, shell, plumbing, electrical, and finish lines each carry their own labor basis. The workbook shows the rate and the arithmetic behind every line.

What drawings do you need?

Send the pool plan, section and shell details, the plumbing and equipment schedule, the electrical one-line or bonding plan, and the site or grading plan. Decking, coping, and fence sheets help if they are in scope. If a sheet is missing, we list the assumptions we used so your bid stays traceable.

Can you use my estimate template?

Send your template with the plans and we confirm whether the estimate can be delivered in it. Most clients take our Excel workbook and map it into their own bid form. We tell you before the quote whether your format works or whether the line structure needs adjusting.

Do you sign NDAs?

Clients can request an NDA before sending drawings, and the terms are agreed before plan review begins. Send the draft with your request so both sides sign before any files move. We do not describe a standard policy beyond that; the terms are set per client.

What is included in a gunite pool takeoff?

The takeoff covers excavation in cubic yards including over-excavation, the rebar cage by bar size and linear feet, shotcrete shell volume from thickness and surface area, and the plaster finish in square feet. Plumbing counts schedule 40 PVC by diameter and linear foot, plus skimmers, main drains, return lines, and the hydrostatic relief valve. Equipment, gas line, and bonding grid lines follow the schedules.

How do you handle pool excavation quantities?

Excavation is measured from the plan dimensions and depth, then converted to cubic yards, with over-excavation for the shell and working room added as a separate line. Soil type and haul-off distance drive the disposal cost, and diesel price movement affects the equipment portion. We show the measurement rule so you can check the volume.

Do you estimate commercial pool construction?

Yes. Commercial pools add gutter systems, surge tanks, chemical rooms, and code-driven deck and barrier requirements, so the takeoff follows Division 13 special construction alongside Division 31 earthwork and Division 22 plumbing. We price from the permit set and note where the design leaves a quantity open.

Can you price a pool renovation?

Yes. Renovation takeoffs start with demolition of plaster, tile, and coping, then rebuild the finish, waterline tile, and equipment replacement lines. Existing conditions are the main risk, so we list the assumptions about substrate and plumbing reuse. Confirm local code editions with the building department before finalizing scope.

How do you handle pool equipment takeoff?

Equipment is taken off from the schedule: pump, cartridge filter, heater, salt chlorinator, and controls, each with quantity and connection size. Gas line sizing and the electrical circuit for the heater are priced on their own lines. If the schedule is generic, we note the model class assumed.

What does the finished estimate look like?

You receive an Excel workbook and a PDF summary with marked-up drawing pages. Each line shows quantity, unit, measurement rule, and source, so a reviewer can trace a number back to the sheet. The workbook is structured so you can sort by CSI MasterFormat division or by trade.

Why is swimming pool estimating different from general building takeoff?

Swimming pool estimating mixes earthwork, structural concrete, plumbing, electrical, and finishes in one small footprint, and the shell geometry drives most of the quantity. Curved walls, hopper bottoms, and stepped entries mean the surface area cannot be read from a simple length times width. We measure each shape and show the rule used.

Do you estimate decking and coping separately?

Yes. Coping is measured in linear feet, decking in square feet, and the expansion joint between them is its own line. Paver coping and cast-in-place coping price differently, so the material is named on the line. That separation keeps the bid comparable across bidders.

Send pool plans for a quoted takeoff

Send your pool drawings, equipment schedule and any estimate template you want used, and we will review them and return a written fee quote with the delivery date. The takeoff then arrives as an Excel workbook and PDF summary with marked-up drawing pages.

Request a Free Quote