KNRConstructionsSend Plans

Wood, Plastics and Composites Estimating for Division 06

Wood, plastics and composites estimating at KNR covers Division 06 from framing lumber through architectural woodwork, casework and countertops. We serve general contractors, trade contractors, owners and developers working from framing plans, elevations and cabinet schedules. You receive an Excel workbook and PDF summary with marked-up drawing pages, so every quantity traces back to a sheet, a unit and a measurement rule.

  • Division 06 rough carpentry through finished millwork
  • Board feet, linear feet and square feet kept separate
  • Waste factors stated per line, not buried
  • Marked-up drawings show where each quantity came from

Upload your plans

Send drawings and a short scope. You get a fixed price before any work starts.

What does a wood, plastics and composites estimating takeoff include?

Wood, plastics and composites estimating covers Division 06 line items: rough carpentry lumber and sheathing, engineered lumber and glulam, blocking and furring, architectural woodwork, casework, plastic laminate, solid surface and quartz tops, trim and composite decking. Each line carries a unit, a measurement rule, waste and a drawing reference.

Our Professional Wood, Plastics & Composites Estimating

Division 06 covers more than lumber. It runs from rough carpentry and plywood sheathing through architectural woodwork, plastic laminate casework, solid surface tops and composite decking, and each of those lines is measured with a different unit and a different waste rule. Our wood, plastics and composites estimating starts by reading the drawings at the right scale and writing down the measurement rule before any number is entered.

We record the source sheet, the scale, the unit and the waste factor against every line, so a reviewer can retrace a board foot or a square foot back to the elevation or plan it came from. Lumber lines carry a note on grade stamp and moisture content where the specification names them, because a wet framing package and a kiln-dried one do not price the same. The same discipline applies where civil estimates support site packages that share a schedule with the building.

Division 06 measurement units by work item
Work itemPrimary unitSecondary checkTypical waste allowance
Rough carpentry framingBoard feetLinear feet by member size5–10%
Plywood sheathing and subfloorSquare feetSheet count at 32 sq ft per 4x8 sheet5–10%
Engineered lumber and glulamLinear feetPiece count and weight2–5%
Architectural woodwork and millworkLinear feetUnit count from elevations5–10%
Plastic laminate caseworkUnit countSquare feet of face area3–5%
Solid surface and quartz topsSquare feetLinear feet of edge profile5–10%
Composite decking and railingSquare feetLinear feet of railing and posts5–10%

Wood, Plastics & Composites material takeoffs

A division 06 wood plastics and composites takeoff is organized by assembly, not by material list. Framing is taken off in board feet and linear feet from the framing plan, sheathing in square feet from the wall and roof areas, trim and molding in linear feet from the elevations, and casework by unit count from the cabinet schedule. Each line shows the quantity, the unit, the waste allowance and the drawing reference. You receive the Excel workbook with the arithmetic visible and a PDF summary with marked-up drawing pages, so the quantities can be checked against the sheets.

Wood, Plastics & Composites labor cost estimates

Labor is priced in hours per unit and converted at the published wage for the trade, then reviewed by an estimator who knows the local market. Carpentry hours per board foot of framing, per linear foot of base and casing, and per cabinet box differ enough that a single blended rate hides the problem lines. We keep them separate, add supervision and show the burden assumption in a column rather than folding it into the rate. Wage data is refreshed from public sources, so the hours stay visible and the dollars move with the data.

Bid-ready Wood, plastics & composites cost estimates

The bid-ready package totals material, labor and equipment by CSI MasterFormat line and by area, with alternates and unit prices listed separately so you can carry them into a bid form. Allowances for solid surface and quartz tops or for owner-selected specialties are flagged as allowances, not buried in a lump sum. Every subtotal ties back to the takeoff rows, and the marked-up sheets show where each quantity was read.

What Is Included in Our Wood, Plastics & Composites Estimates?

Every estimate is built from the same three layers: the components counted, the quantities measured and the cost build-up behind them. The scope of the wood, plastics and composites estimating package below applies to a single trade package and expands with the number of buildings on the drawings. Framing quantities are cross-checked against our lumber takeoff and estimating output so the board feet and the sheathing areas reconcile before pricing.

Line-item structure in the estimate workbook
ColumnWhat it holdsSource
Item and CSI codeDivision 06 section and descriptionSpecification and drawings
Quantity and unitBoard feet, linear feet, square feet or countTakeoff with measurement rule
Waste factorPercentage applied to the net quantityTypical range by work item
Material rateUnit cost before adjustmentNational average unit cost
Labor hoursHours per unitEstimator review of the scope
Labor rateHourly wage plus burdenPublic wage data
Line totalMaterial plus labor plus equipmentArithmetic shown in the cell

Rough carpentry, architectural woodwork, casework and tops

The component list follows the specification sections and the schedules. Typical items include:

  • Rough carpentry: wall, floor and roof framing, blocking, furring, sheathing and subfloor.
  • Architectural woodwork: standing and running trim, paneling, stair parts and shop-fabricated units.
  • Casework: base, wall and tall cabinets, vanities, and plastic laminate faces and tops.
  • Countertops: solid surface, quartz and laminate, with edge profiles and backsplashes.
  • Exterior: composite decking, railing, posts and concealed fasteners.

A millwork and casework quantity takeoff is driven by the cabinet schedule and the interior elevations, while rough carpentry is driven by the framing plan. Where the two disagree, we note the conflict instead of picking one silently.

Board feet, linear feet, square feet and unit counts

Quantities are reported in the unit the trade actually buys in. Framing converts to board feet using nominal thickness times nominal width times length, with the conversion rule printed on the sheet. Sheathing, decking and tops are measured in square feet; trim, railing and edge banding in linear feet; cabinets, doors and specialty units by count. A cut list is added where the specification calls for shop fabrication, so offcuts and waste are visible rather than assumed.

Materials, labor, equipment and cost breakdowns

Each line carries four columns: material, labor, equipment and total. Material is priced from national average unit costs adjusted with published wage and price data. Labor is hours per unit times the trade wage, with supervision and burden shown separately. Equipment covers the small tools, lifts and shop time the work needs. The workbook keeps the formula in every cell, so a change to a quantity or a rate flows through the subtotal without a hidden override.

Who Needs Our Wood, Plastics & Composites Estimating?

The estimate is used differently by each party on the project, so the deliverable is organized so that a subcontractor can price a bid and a developer can test a budget from the same workbook. Wood framing material takeoff services feed the first group; the summary tabs serve the second.

Carpentry and millwork subcontractors

Framing crews and millwork shops use the takeoff to buy material and to check a bid before it goes out. A framing package is reviewed against the framing plan member by member, and a millwork package against the elevation drawings in linear feet of trim and count of units. When the shop drawings arrive, the quantities are re-checked against them, because a revised cabinet schedule can move a casework line by a large share of the package. Subcontractors who carry several trades can route the other packages through our trade estimating services.

General contractors and home builders

A general contractor uses the division 06 estimate to set the carpentry budget, to compare subcontractor bids line by line and to price changes. A builder running several house plans uses the same workbook to see which plan carries the most millwork per square foot. The wood, plastics and composites estimating summary shows the cost per unit of casework and per square foot of decking, which is the number that survives a design change.

Developers, architects and suppliers

Developers test a pro forma against the architectural woodwork allowance before design is frozen. Architects use the marked-up sheets to see which details drive cost, such as a full-height paneled wall or a waterfall countertop edge. Suppliers and material dealers use the quantities to quote a package and to plan deliveries against the construction sequence. Wood, plastics and composites estimating gives each of them the same unit and measurement rule behind every line.

Types of Wood, Plastics & Composites Projects We Estimate

Project type changes the scope mix more than it changes the method. The same measurement rules apply, but the dominant line items and the documentation available differ, and that changes how much of the takeoff can be read directly from the drawings. Wood, plastics and composites estimating follows the same sequence in every case: read the drawing set, apply the unit and measurement rule, then price labor and material from the same quantity.

Scope mix by project type
Project typeDominant division 06 scopeKey drawing inputCommon failure mode
Single-family residentialFraming, sheathing, trim, cabinetsFraming plan and cabinet scheduleMissing blocking and furring
Multifamily residentialFraming, casework, countertops, deckingUnit plans and typical elevationsRepeating units counted once
Commercial office and retailArchitectural woodwork, millwork, caseworkInterior elevations and shop drawingsAWI grade not priced
HospitalityCasework, solid surface tops, panelingMillwork details and schedulesEdge profiles left out
IndustrialRough carpentry, blocking, treated lumberStructural and equipment drawingsExposure-grade lumber assumed
InfrastructureComposite decking, railing, boardwalksSite and detail drawingsExpansion gaps and flashing omitted

Residential projects

Houses and multifamily buildings carry the heaviest framing share, so the takeoff leans on the framing plan and the wall and roof areas. Interior scope is read from the cabinet schedule and the interior elevations, with plastic laminate casework estimating driven by unit count and square feet of face area. Repeat plans are taken off once and adjusted per building. Related packages are handled under our framing estimating services.

Commercial buildings

Offices, retail and hospitality shift the weight to architectural woodwork, millwork and casework, where the specification, AWI grade and shop drawings set the cost. Blocking and furring for wall-mounted units are easy to miss and are called out as separate lines. Composite decking and railing appear on rooftop and amenity areas. Where a tenant improvement starts with strip-out, the wood and casework lines are kept separate from the demolition estimating services scope so the two packages do not double-count.

Industrial and infrastructure projects

Industrial work is mostly rough carpentry, blocking, sheathing and temporary wood, often with treated lumber and hardware specified by exposure. Infrastructure packages bring composite decking, boardwalks and railing with expansion gaps and flashing details that must be measured. Where the wood package sits inside a larger civil scope, the quantities are formatted to merge into our civil estimating services workbook.

Our Wood, Plastics & Composites Estimating Process

Division 06 quantities start with what the drawings actually dimension. We read the framing plan, floor plans, interior elevations and the finish schedules before opening a takeoff, because a casework run measured off a floor plan and the same run measured off an elevation rarely agree. Where the two conflict, we note the conflict rather than picking one silently.

The sequence below is the same for a single-family trim package and for a multi-story architectural woodwork scope, and it is the backbone of our wood, plastics and composites estimating. Each step ends with a check that has to pass before the next one begins.

  1. Submit drawings and specifications

    Send the architectural and structural sheets, the Division 06 specification sections, and any cabinet, countertop or door schedules. Shop drawings and approved submittals matter here: a casework elevation that has already been through review is a better quantity source than the design drawing it replaced. Include the finish schedule so we can separate plastic laminate, wood veneer, solid surface and quartz by location. If a sheet is missing, we list it as an assumption instead of guessing the scope.

  2. Plan review and digital takeoff

    We scale the drawings on screen, set the measurement rule per assembly, and tag every quantity to the sheet and grid line it came from. Framing members are counted by piece and converted to board feet or linear feet; sheathing, decking and panel goods are measured in square feet with a stated waste factor; trim and molding run in linear feet along the wall they belong to. A composite decking and railing takeoff is measured along the deck perimeter and joist layout, with stair runs, posts and fascia counted separately because they price separately. The first check is a re-measure of a sample of lines against the drawing.

  3. Cost calculation, quality checks and delivery

    Quantities flow into a pricing workbook where each line carries a unit cost, labor hours and a source note. A second estimator reviews the assembly logic, the waste allowances and the labor rates before anything ships. The finished package is an Excel workbook and a PDF summary with marked-up drawing pages, so you can trace any figure back to the sheet. The fee is quoted per project after we review the plans; send your drawings through our trade estimating services page and we will confirm scope and price before starting. For cabinet, countertop and finish scopes, the millwork and casework estimates follow the same traceable sequence.

Sample Wood, Plastics & Composites Estimate and Deliverables

The example below is illustrative only. It assumes a 2,400-square-foot single-family interior package: 120 linear feet of plastic laminate base cabinets at 36 inches high, 60 linear feet of wall cabinets, 210 square feet of quartz countertop with a 4-inch backsplash, 320 linear feet of painted wood base and casing, and 96 linear feet of blocking at cabinet and rail locations. Quantities are net; waste is applied per line as shown. Unit costs are placeholders for the arithmetic, not a quote.

Check the arithmetic: cabinet linear feet times unit cost gives the extended range, and the two totals add to the package subtotal before tax and overhead. Your own project will carry different quantities and different local rates, which is why every line in our sheet shows its measurement rule and source.

Illustrative Division 06 interior package — placeholder unit costs, arithmetic checked
ItemQtyUnitUnit cost rangeExtended range
Plastic laminate base cabinets, 36 in high120LF$310 – $395$37,200 – $47,400
Plastic laminate wall cabinets60LF$210 – $265$12,600 – $15,900
Quartz countertop with 4 in backsplash210SF$68 – $92$14,280 – $19,320
Painted wood base and casing320LF$9.50 – $13.00$3,040 – $4,160
Blocking at cabinets and rail locations96LF$6.00 – $8.50$576 – $816
Package subtotal (before tax and overhead)———$67,696 – $87,596
  • Excel quantity takeoff sheet

    One row per item, with description, quantity, unit, measurement rule, waste factor, waste-adjusted quantity and the drawing reference. The architectural woodwork cost estimate lines carry the AWI grade and finish designation from the specification so the pricing reviewer can see which grade drove the rate. A cut list tab groups framing and blocking members by size and length so the lumber order can be placed directly from the sheet.

  • Marked-up drawings

    The same PDF set you sent, with color-coded takeoff marks on each sheet: cabinet runs and countertop schedule locations on the elevations, blocking and furring on the wall sections, decking and rail runs on the plan. Each mark carries the line number that appears in the workbook, so a reviewer can go from a total in the spreadsheet back to the exact wall.

  • Itemized cost estimate

    Material, labor hours and equipment separated per line, with the labor rate and productivity assumption stated in a visible column. Plastic laminate, solid surface and quartz are priced as distinct finish categories rather than one casework lump. Assumptions and exclusions sit on their own tab: items we could not measure, allowances we carried, and code items you asked us to leave out.

Software and Pricing Data We Use

Every Division 06 line has two inputs: a quantity and a rate. The quantity comes from the drawings under a stated measurement rule; the rate comes from published data adjusted for your location and project conditions. Keeping those two separate is what makes a number traceable when a reviewer asks where it came from.

Takeoff and estimating software

We work in on-screen PDF takeoff tools that scale drawings and drop measured marks onto the sheet, a spreadsheet estimating workbook that carries the line-item structure, and cost databases that supply assembly-level unit costs. The rough carpentry lumber takeoff is built member by member from the framing plan, then rolled up by size so the order matches a supplier's pricing unit. Panel goods, solid surface slabs and shop drawings are cross-checked against the schedules before the quantities are locked.

Regional material and labor pricing method

Base rates come from national average unit costs. Material lines are adjusted with the Producer Price Index series shown in the chart below, which tracks lumber and wood products, so a scope priced in a rising market reflects that movement rather than a stale catalog figure. Labor lines are built from the BLS wage data in the wage table below, then adjusted for your metro, prevailing wage requirements and project conditions such as occupied-space work or upper-floor access. The chart and table refresh with the underlying data; the workbook records which vintage was used on your estimate.

Material price movement, Oct 2023 to Sep 2026

95108120Oct 2023Sep 2026
Lumber and wood products: +14.6%Gypsum products: +7.3%
Index rebased to 100 at Oct 2023. Source: U.S. Bureau of Labor Statistics, Producer Price Index (WPU081, WPU137), updated 2026-10-25.
U.S. hourly wages for the trades in this scope (latest BLS release)
Occupation25th percentileMedian75th percentile
Carpenters$23.32$29.12$36.94
Construction laborers$18.57$22.66$28.72
First-line supervisors, construction trades$30.48$38.42$48.78

Base wages before payroll taxes, insurance and benefits. Source: BLS Occupational Employment and Wage Statistics, national, all industries.

Why Contractors Choose Our Estimating Services

The reasons here are about method, not claims. A takeoff you can audit is worth more than a lower number you cannot defend in a bid review.

Trade-specific expertise

Division 06 is not one trade. Rough carpentry, architectural woodwork, millwork, casework and composite decking each have their own units and their own failure modes, and we price them on separate lines. A solid surface and quartz countertop takeoff is measured to the countertop schedule with sink and cooktop cutouts deducted, not estimated as a percentage of floor area. Composite decking is measured with the expansion gap and fastener layout in mind, because board count changes with the gap. Trim and molding runs are taken wall by wall so the linear feet survive a field check.

Quality control and clear assumptions

A second estimator reviews every package against the submittals and specifications before delivery. Assumptions are written down, not buried: an unconfirmed grade stamp, a missing wall section or an unresolved door schedule becomes a named line in the assumptions tab. Where the drawings disagree with each other, we flag it rather than averaging the two. That record is what lets you defend a number in a bid review or a change order discussion.

Turnaround, communication and revisions

Delivery dates are agreed in writing when we confirm scope, based on sheet count and the number of schedules involved. We confirm the date before work starts rather than after. Revisions are handled against the same line numbers, so a revised sheet produces a marked-up delta you can compare to the previous issue. If you need a second scope priced, or a division outside this one, our professional trade estimating services cover the adjacent trades, and professional sitework estimating services handle the earthwork and utilities below the slab. You can send your plans to start a quote.

Wood, Plastics & Composites Estimating Pricing

The fee for wood, plastics and composites estimating is quoted per project after we review the plan set. We do not publish a rate card, because a two-sheet tenant fit-out and a 40-sheet multifamily package carry very different reading time in Division 06. Send the drawings, the cabinet and countertop schedules, and any alternates or addenda, and the quote states the scope we priced and the fee for it.

Every line in the workbook carries a unit, a measurement rule, and the arithmetic behind the extension. An engineered wood products takeoff, for example, shows each joist, header and beam by size and span, with the design assumption noted where the framing plan is silent. Where architectural woodwork is specified to AWI standards, the quote reflects the grade and finish callouts, since those change the labor allowance more than the board footage does.

The calculator below is a budget tool, not our quote. Enter the building area, your own base hard cost per square foot, and your soft-cost, contingency and escalation percentages, and it returns hard cost, soft costs, contingency, escalation, the budget total and an all-in cost per square foot. It holds no prices of its own, so the result is only as current as the base cost you type in.

How quotes are calculated

We price from the drawings, not from a building-type average. The estimator reads the framing plan, the elevations, the cabinet schedule and the countertop schedule, then quantifies each item in its own unit: board feet for engineered lumber, linear feet for trim and blocking, square feet for sheathing and panel goods. Waste factors are stated per line at typical ranges and flagged so you can adjust them.

Labor is built from hours per unit and adjusted with published wage data, and material lines are checked against published price movement for lumber and wood products. A plastic laminate casework line shows the case, the door and drawer fronts, the adhesive and fastener allowance, and the counter separately, so a substitution does not silently reprice the whole room. If you want the underlying quantities without the pricing, our measured quantity takeoff deliver the same measured lines.

What affects price and delivery time

Sheet count and the number of trades on the sheets are the first drivers. A set with separate architectural, millwork shop drawings and structural framing sheets takes longer to reconcile than a single combined set, because the cabinet schedule and the framing plan must agree on blocking and furring locations before anything is extended. Alternates and addenda add time in proportion to how much they touch Division 06.

The bid date sets the deadline we work to. Delivery time is confirmed with the quote, and the date we commit to is the date on the quote. A complete set, a current addenda log and a named contact for questions shorten the review; missing elevations or an unresolved finish schedule lengthen it. If the scope spans other divisions, our division-by-division estimating support can bundle them under one submittal.

Square-foot budget calculator

Hard cost
$444,000
Soft costs
$53,280
Contingency
$49,728
Escalation
$21,880
Budget total
$568,888
All-in per sq ft
$237

Enter your own base rate from a recent bid, cost book or estimator. The default values are placeholders for the math, not market prices.

Wood, Plastics & Composites Estimating Across the US

Carpenter and labor wage levels differ by region, and public work adds prevailing wage requirements that change the labor side of a wood, plastics and composites estimating sheet more than any material line. We adjust labor rates to the project location using published wage data, and the workbook shows the rate applied on each line so you can check it against the wage decision on your job.

Material delivery is the second regional variable. Framing lumber, glulam members and long trim stock may ship from outside the local market, so freight and lead time enter the line rather than sitting in a lump sum. Grade stamps on delivered lumber and the moisture content at installation affect both waste and callbacks, and we note where the specification sets a limit. Climate drives fastener and flashing selection: coastal and high-wind areas push toward stainless and hot-dip galvanized, and wet climates change the adhesive and sealant callouts for exterior composite decking and railing.

Code editions vary by jurisdiction, so confirm the adopted IBC or IRC edition and any local amendments with the building department before the numbers are locked. One team covers all states, and the regional adjustment appears as a visible line, not a hidden multiplier. For the framing side of the same package, see our framing cost estimating, or send your plans to start the review.

Frequently Asked Questions

How much does a Wood, plastics & composites estimate cost?

The fee is quoted per project after we review the drawings. It depends on the sheet count, how many cabinet and countertop schedule rows need measuring, how many alternates you want priced, and whether the package includes both rough carpentry and architectural woodwork. Send the plans and Division 06 specifications and the quote will state the fee and the scope it covers.

How long does a Wood, plastics & composites takeoff take?

The delivery date is set when we quote, after the plan review, and it is confirmed in writing with the fee. It depends on the number of drawing sheets, whether the framing plan and schedules are complete, and how many questions the review raises. We do not promise a turnaround before that review, because incomplete schedules change the work.

Do you estimate labor and material costs?

Yes. Each line carries a material cost and a labor cost, with labor hours extended at wage rates adjusted from published U.S. Bureau of Labor Statistics data for carpenters, construction laborers and construction supervisors. Material pricing is adjusted with Producer Price Index series, including lumber and wood products. An estimator reviews every adjusted line before the workbook is released.

What drawings do you need?

Send architectural floor plans and elevations, the framing and roof plans, the cabinet schedule, the countertop schedule, door and finish schedules, and the Division 06 specification sections. Structural sheets help where engineered lumber and hangers are involved. If a schedule row is unlabeled or an elevation is missing, we raise it as a question before takeoff starts.

Can you use my estimate template?

Send your template with the plans and we will confirm whether the estimate can be delivered in it. Many clients use our Excel workbook as issued, and some need their own cost codes or bid form structure. The answer is confirmed at the quote stage, before takeoff begins, so the deliverable matches what your team expects.

Do you sign NDAs?

Clients can request a non-disclosure agreement before sending drawings, and the terms are agreed before plan review begins. Send the document you want signed along with your request, and we will confirm the arrangement before any files are transferred. We do not describe a standard policy beyond that.

How do you handle waste factors on lumber and sheet goods?

Waste is applied by category and labeled as a typical range, not one blanket percentage. Framing lumber, plywood sheathing, lineal trim and composite decking each carry their own allowance because cut patterns differ. The factor appears on the line so you can change it if your crew's historical waste differs from the typical range.

Do you take off board feet or linear feet for framing lumber?

Both, depending on the line. Framing lumber is extended in board feet from nominal dimensions so the yard order matches, while trim, blocking and furring are measured in linear feet by size. Engineered wood products are taken off by member mark from the framing plan, with hangers and connectors counted each.

How are countertops and casework measured?

Casework is measured by room and elevation in linear feet, with plastic laminate faces in square feet and edgebanding in linear feet on separate lines. Solid surface and quartz tops are measured in square feet of top, with sink and cooktop cutouts counted each and backsplash in linear feet. The measurement rule is printed on each line.

Can you price composite decking against pressure-treated lumber as an alternate?

Yes. Both alternates are measured with the same rule so the comparison is honest: decking by board length, railing by post spacing, and fasteners and clips counted each. Concealed fastener systems and fascia are separate lines. The workbook shows both totals side by side with the assumptions stated.

Do you follow AWI grades for architectural woodwork?

Where the specification names an AWI grade, we carry it as a note against the casework lines, because custom, premium and economy grades change material selection and joinery labor. If the grade is not stated, we raise it as a question rather than assuming the highest grade. Confirm the grade with the design team before bid.

Which CSI MasterFormat sections does this page cover?

This page covers Division 06, Wood, Plastics and Composites, in the current 50-division format. That includes rough carpentry, architectural woodwork, millwork, casework, plastic laminate, solid surface and quartz countertops, composite decking and railing, and engineered wood products. Adjacent divisions such as concrete and structural steel are coordinated so blocking and embeds are not double-counted.

How is wood, plastics and composites estimating handled when the schedules are incomplete?

Wood, plastics and composites estimating depends on the cabinet, countertop and finish schedules being measurable, so incomplete schedules are logged as questions before takeoff. We proceed on the sheets that are complete and mark the affected lines as pending. That keeps the workbook usable while the design team closes the gaps, and the assumptions stay visible on the sheet.

Send Division 06 drawings for a quote

Send the architectural and framing plans, the cabinet and countertop schedules, and the Division 06 specifications. We review the set, confirm scope and delivery date in the quote, and return an Excel workbook with a PDF summary and marked-up drawing pages.

Request a Free Quote