Budgeting for Winter Construction Costs: Cold-Weather Estimating Guide

Winter construction costs are the added line items cold weather puts on an estimate: heated enclosures, ground thawing, accelerators, snow removal and lost weather days. We estimate those items for general contractors, trade contractors, owners and developers across all U.S. states, and deliver an Excel workbook and PDF summary with marked-up drawing pages so every number can be traced back to its source.

  • Cold weather line items priced by CSI division
  • Concrete curing and protection methods costed separately
  • Weather days carried as explicit schedule float
  • Every unit price tied to a published data source

Upload your plans

Send drawings and a short scope. You get a fixed price before any work starts.

Pencil resting on a dimensioned construction drawing next to a scale ruler

How do you estimate winter construction costs?

Winter construction costs are estimated by adding cold weather line items to the base takeoff: temporary heat and enclosures, ground thawing, concrete protection and accelerators, snow removal and weather days. Each item gets a unit, a measurement rule and a cost code, then a contingency sized to the AACE estimate class.

What Makes Winter Construction Costs Different?

Winter does not raise every line on the estimate. It raises specific lines: temporary heat, freeze protection, snow and ice removal, ground thawing, and the labor hours lost to bulky clothing, frozen hoses and shorter daylight. Cold weather construction estimating starts by naming those lines and giving each one a unit, a measurement rule and a source. A heater is billed by MBH of output and hours run; a hoarding wall by square foot of enclosure; a snow event by cubic yard hauled or by the hour of equipment on site.

The single largest swing item is often cold weather concrete. Division 03 pricing shifts when the mix carries an accelerator or antifreeze admixture, when blankets and heated enclosures hold curing temperature, and when cylinder breaks gate the form-stripping date. That chain is the cold weather concrete curing cost, and it belongs in the estimate as its own cost code rather than buried inside a square-foot rate.

Every added dollar should trace to a unit price, a quantity takeoff and a public data source. We build winter construction costs that way: the wage table below shows current BLS figures for the trades, and the Producer Price Index charts show how ready-mix and lumber moved over the last twelve months. When a supplier quotes a winter premium on ready-mix, you can compare it against the published index instead of accepting it on faith.

Winter cost lines that appear in a cold-weather estimate and the unit each one is measured in
Cost lineCSI divisionUnit of measureMeasurement rule
Temporary heat, indirect-fired01 50 00 Temporary FacilitiesMBH and operating hoursRated output times run hours, by zone
Heated enclosure / hoarding01 50 00 Temporary FacilitiesSquare foot of wall and roof surfaceMeasured face area of the enclosure
Concrete accelerator or antifreeze admixture03 30 00 Cast-in-Place ConcreteCubic yard of concrete, or dose per CYSupplier ticket quantity times dose rate
Curing blankets and enclosures03 30 00 Cast-in-Place ConcreteSquare foot of slab or formed surfaceCovered area per placement
Snow and ice removal31 10 00 Site ClearingCubic yard hauled, or equipment hoursEvent log with truck counts and hours
Ground thawing31 23 00 Excavation and FillSquare foot of thawed area, or per hourThawed footprint at the excavation limit
Insulation upgrade for cold-climate assemblies07 21 00 Thermal InsulationSquare foot at stated R-valueNet area, thickness and R-value per assembly

Cold-weather cost drivers vs. temperate-season baselines

Build the fall or spring estimate first, then add winter layers as separate lines. The baseline carries normal labor hours, standard curing, and no temporary heat. The winter layer adds propane or indirect-fired heat by MBH and run hours, enclosure square footage, snow removal by event, and a productivity factor on exterior trades. Keep the two visible side by side so an owner can see exactly what the season costs.

Productivity is the quiet driver. Cement masons and laborers in the wage table below earn the same hourly rate in January as in June, but a crew pouring in wind chill places less per hour. The estimate should state the assumed loss, for example a stated percentage reduction in daily output for exterior concrete, and show the arithmetic. That number is a judgment, so label it as an assumption and tie it to the winter conditions clause in the contract.

Why traceable numbers beat seasonal rules of thumb

A rule of thumb such as adding a flat percentage to the whole budget hides the real exposure and cannot be defended in a change order. A traceable line states the unit, the quantity and the rate: 1,200 sq ft of hoarding at a stated cost per square foot, 400 hours of temporary heat at a stated MBH load, 60 cubic yards of frozen spoil hauled off site. Each line survives a review because the reviewer can re-measure it.

Traceability also supports the contingency discussion. A winter contingency built from named weather days and named protection items is easier to defend than a round number, and it links cleanly to the way we treat building a defensible contingency line on other projects. For the full picture of what sits inside a winter estimate, see our construction estimate page.

Commercial Construction Estimating During Cold Weather in the USA

Commercial construction estimating cold weather follows the same sequence as any other estimate: quantify, price, then review. The winter work sits in the quantities and in the labor rates. A wall pour in January may need a heated enclosure, a longer cure, and a night watch on the heater; each of those is a line with a unit, not a note in the assumptions.

Schedule is where winter weather delay cost estimating earns its place. Days lost to snow, frozen ground or a missed curing temperature are not free, because the general conditions clock keeps running. Put an explicit weather-day allowance in the schedule and price the standing items it carries. The general conditions in construction breakdown shows which of those standing costs continue during a weather stop.

Curing temperature governs the concrete calendar. When the ambient or surface temperature falls below the threshold the specification sets, the pour either waits or gets protection. An accelerator shortens the wait but adds cost per cubic yard, and it does not replace blankets or heat. Price the accelerator and the protection as separate lines so the owner can see the trade-off. The calculator below converts base wage, burden, overtime share, crew size and hours into a loaded rate you can apply to winter-shortened shifts.

Illustrative worked example: winter labor rate build-up for an exterior concrete crew
InputValueArithmetic
Base wage, cement mason$27.41/hrBLS OEWS national median, shown in the wage table below
Fringe and burden38%$27.41 x 0.38 = $10.42/hr
Loaded straight-time rate$37.83/hr$27.41 + $10.42
Share of hours at overtime15%Overtime premium at 0.5 of base = $13.71/hr
Blended rate$39.89/hr$37.83 + (0.15 x $13.71)
Crew size and hours6 workers x 480 hr2,880 labor hours
Crew labor cost$114,8832,880 x $39.89, rounded

Loaded labor rate calculator

Loaded rate
$31/hr
Blended with overtime
$32/hr
Labor hours
320
Crew labor cost
$10,279

Burden covers payroll taxes, workers’ compensation, insurance and benefits; it varies by state, trade and company. Overtime is priced at time and a half.

Adjusting unit rates for temperature and daylight

Start from the base unit price, then apply a stated productivity factor for exterior work in cold conditions. If a crew normally places a given square footage per shift and the winter assumption cuts that by a set percentage, the labor hours per unit rise by the inverse. Show the factor, the source of the judgment and the resulting hours. Never apply the factor to interior work that is unaffected.

Daylight is a separate constraint. Short days can force overtime to finish a placement once it starts, and overtime carries a premium. The calculator below handles that by letting you set the share of hours at overtime, so the blended rate reflects the winter shift pattern rather than a straight base wage.

Temporary heating and enclosure quantities

Heat is a quantity, not a lump sum. Take the enclosure volume or surface area, estimate the heat loss at the design temperature difference, and convert to MBH. Then multiply by the hours the heater runs, including the standby hours after the pour while curing temperature is held. Fuel consumption follows the heater rating and run hours, and fuel price is tracked through the Producer Price Index rather than guessed.

Enclosure quantities come from the geometry. Measure the wall and roof area of the hoarding, add for openings and overlaps, and price per square foot of surface. A heated enclosure around a small elevator core is a different quantity from one around a full floor plate, and the estimate should show both if both occur.

Winter-specific general conditions

Add the winter items to the general conditions section: snow removal equipment on standby, sanding and salting, heat for temporary offices, freeze protection for water lines and sprinkler piping, and a longer site cleanup cycle. Each is measurable. Snow removal by event log, temporary heat by MBH and hours, and freeze protection by linear foot of protected pipe.

These lines belong in the construction budget estimate at the same level of detail as the permanent work. If the project needs a full commercial takeoff across all divisions, our commercial takeoff and pricing team prices the winter items alongside the base scope.

Winter Construction Best Practices That Keep the Budget Warm

Winter construction best practices are budget tools when they are written as line items. Accelerated curing, a heated enclosure and a weather-day allowance each have a unit and a cost code, so the field decision and the estimate speak the same language. That alignment is what keeps a January change order from surprising the owner.

Each practice maps to a MasterFormat division. Curing protection sits in Division 03, temporary heat and hoarding in Division 01, snow removal and ground thawing in Division 31, and cold-climate insulation upgrades in Division 07. When the takeoff uses those divisions, the winter lines roll up with the permanent work and the audit trail stays intact. Our early-stage budget estimates carry the same structure before design is complete.

Insulation deserves its own line in cold climates. Thickness and R-value drive both the material quantity and the temporary heat load, so an upgrade can pay back within the heating season on an enclosed building. Price the assembly by square foot at the specified R-value, and keep the vapor barrier and air barrier continuous so the heat you pay for stays inside.

Winter best practices mapped to cost codes and units
PracticeCSI divisionCost code lineUnit
Accelerated curing with admixture03 30 00Concrete admixture, winter mixPer cubic yard
Heated enclosure for placement01 50 00Temporary heat and hoardingMBH-hours and square foot
Curing blankets on slabs03 30 00Concrete curing protectionSquare foot covered
Snow removal and ice control31 10 00Site winter maintenanceCubic yard and equipment hour
Ground thawing before excavation31 23 00Frost removalSquare foot or hour
Insulation upgrade, cold-climate wall07 21 00Thermal insulation at stated R-valueSquare foot
Weather-day allowance01 31 00Schedule contingency, weather daysDay times daily standing cost

Sequencing to minimize exposed work

Sequence so that exterior concrete, masonry and coatings land in the milder windows, and push interior rough-in forward. That is a scheduling decision with a cost consequence: it may require temporary heat earlier to make the interior workable. Price the heat for the shifted period and show it against the savings from avoiding exterior protection.

A drying-in milestone before the coldest weeks is worth money. Once the envelope is closed, the heated enclosure for concrete gives way to permanent heat, and the temporary heat line drops. Show both phases in the estimate so the owner sees the crossover.

Material selection and storage rules

Cold storage changes material behavior. Ready-mix needs a stated minimum temperature at placement, masonry units should be covered, and adhesives and sealants have application temperature limits printed on the data sheet. Each rule becomes a storage or protection line: heated storage container by square foot or by month, cover tarps by square foot, and a temperature log kept by the superintendent.

Where the specification allows, an accelerator or antifreeze admixture can replace some protection. Price the admixture per cubic yard against the blankets and heat it displaces, and let the comparison decide. The site-level cost breakdown covers the items that support these decisions.

Schedule buffers and weather-day allowances

Count the weather days from historical records for the location and season, then price the standing costs those days carry. A weather-day allowance is a quantity of days times a daily standing cost, not a percentage. Hold it in a separate line so it can be drawn down and reported against actuals.

Pair the allowance with schedule float on the critical path. Float does not cost money directly, but losing it triggers overtime, and overtime is priced. Our budget tracking guidance shows how to carry the allowance through the season. For insulation quantities in cold-climate assemblies, our thermal insulation takeoff team prices thickness, R-value and barrier continuity by square foot.

Cost Estimating for Insulating Materials in Cold Climates

Cold-climate insulation estimating starts with an assembly list, not a material list. You take off each roof, wall, and slab-on-grade type separately, because the same square footage carries different thickness, vapor control, and air sealing quantities depending on where it sits in the envelope. Every quantity goes to a CSI MasterFormat line under Division 07 Thermal and Moisture Protection, with the R-value and thickness printed in the description so the number can be checked later.

Ground thawing and wind chill change the installation side of the rate, not the material side. Insulation installed over frozen subgrade or in an open shell exposed to wind chill takes longer and needs more board staging, so the labor component of the unit price rises while the material component follows published price movement. The chart below shows the Producer Price Index series for the materials in this scope, rebased to 100, so you can see which inputs have moved and by how much since the base period.

Material price movement, Oct 2023 to Sep 2026

85118150Oct 2023Sep 2026
Lumber and wood products: +14.6%Ready-mix concrete: +6.3%Steel mill products: +27.8%Copper wire and cable: +47.5%
Index rebased to 100 at Oct 2023. Source: U.S. Bureau of Labor Statistics, Producer Price Index (WPU081, WPU1333, WPU1017, WPU102502), updated 2026-10-25.

R-value targets and thickness takeoffs

Take off wall area net of openings, then apply the R-value target from the specification and convert it to thickness for the specified product type, since R-value per inch differs between batt, blown-in, and rigid board. A 10,000 sq ft wall with 1,500 sq ft of openings nets 8,500 sq ft of insulated area; do that subtraction before pricing anything. Roofs are taken off at the slope measurement, not the plan footprint, and slabs at the perimeter plus under-slab area. Confirm the code edition and climate zone requirements with the building department before fixing the R-value target.

Vapor barriers and air sealing quantities

Vapor barriers are measured in the same square footage as the assembly they serve, plus 10 percent typical lap and waste, and they are a separate line from the insulation itself. Air sealing is counted by linear foot of joint, penetration, and perimeter rather than by area, so it never scales with the wall square footage. Keep these on their own cost codes: when a change order arrives, the reviewer can see whether the vapor barrier or the R-value changed. Our envelope and thermal pricing team prices these lines by assembly and shows the measurement rule behind each quantity.

Insulation unit costs by assembly

Each assembly line carries a unit of measure, a thickness, and a unit price, and the extended amount is quantity times unit price with the waste factor already inside the quantity. Material movement from the chart below is applied to the material portion only; the labor portion is adjusted with the wage table below and the productivity factor for cold-weather installation. That separation is what makes the estimate defensible when a supplier price changes between bid and award. If you need the full envelope priced alongside the rest of the shell, our trade-by-trade takeoff and pricing group puts the insulation lines in the same workbook as the structural and mechanical trades.

Illustrative Worked Example: Winter Cost Adders for a 10,000 sq ft Commercial Shell

The example below is illustrative only: the unit prices are invented for the arithmetic, not KNR rates. The building is a 10,000 sq ft single-story commercial shell on a slab, estimated with an 8-week winter window. Division 03 Concrete work is priced with a cold-weather protection allowance, and Division 31 Earthwork carries a frost depth allowance for the foundation excavation.

Each adder is a separate line with a unit, a quantity, and a rule, so the reviewer can accept or reject it individually rather than arguing about a lump sum. The contingency reserve explained below is not used in this example; it applies to the base estimate, and the winter adders here are known scope rather than unknown risk.

Illustrative winter cost adders — 10,000 sq ft commercial shell, 8-week window
Cost codeLine itemQuantityUnitUnit priceExtended
01 50 00Snow removal allowance6event$850.00$5,100
03 30 00Cold-weather concrete curing allowance1allowance$9,000.00$9,000
07 21 00Insulation upgrade over base10,000sq ft$1.20$12,000
31 23 00Frost depth allowance, foundation excavation1allowance$4,500.00$4,500
01 54 00Temporary heat, 60 MBH average demand480MBH$18.00$8,640
01 54 00Labor productivity adjustment, factor 0.851allowance$21,176.00$21,176
—Total winter premium———$60,416

Square-foot budget calculator

Hard cost
$444,000
Soft costs
$53,280
Contingency
$49,728
Escalation
$21,880
Budget total
$568,888
All-in per sq ft
$237

Enter your own base rate from a recent bid, cost book or estimator. The default values are placeholders for the math, not market prices.

Stated assumptions and quantities

Assumptions: 10,000 sq ft floor area; 8-week winter window; temporary heat priced at $18.00 per MBH; insulation upgrade at $1.20 per sq ft over 10,000 sq ft; base labor of $120,000 in the winter window; labor productivity factor 0.85; snow removal allowance of 6 events at $850 each; frost depth allowance of $4,500. Concrete protection is carried as a cold-weather concrete curing allowance of $9,000 for blankets, enclosures, and accelerators. The table below lists every line before arithmetic.

Arithmetic for temporary heat, insulation, and labor adjustment

Temporary heat: 8 weeks at 60 MBH average demand equals 480 MBH, times $18.00 equals $8,640. Insulation upgrade: 10,000 sq ft times $1.20 equals $12,000. Labor adjustment: $120,000 divided by 0.85 equals $141,176, so the productivity premium is $21,176. Snow removal: 6 times $850 equals $5,100. Add the concrete curing allowance of $9,000 and the frost depth allowance of $4,500. The sum of adders is $8,640 + $12,000 + $21,176 + $5,100 + $9,000 + $4,500 = $60,416.

Total winter premium as a percentage

The winter premium is $60,416. Against a base hard cost of $1,800,000 for the shell, that is 3.36 percent, calculated as $60,416 divided by $1,800,000. That percentage is the number to carry into winter construction budget planning: it tells the owner what the season costs before any weather delay, and it sits beside contingency rather than inside it. For the full shell estimate with these adders itemized, send your plans and we will show the measurement rule behind each line.

What Drives Winter Construction Costs Up or Down?

Winter construction costs move on four levers: how cold and how long, what fuel costs, who is available to work, and how much protection the specification demands. Each lever is estimable if you attach it to a quantity and a rule. The contingency calculator below maps your base estimate and AACE estimate class to a low and high contingency range, so you can see how much of the season's uncertainty belongs in the budget before you price any single adder.

Contingency range by estimate class

Low contingency
$150,000 (10%)
High contingency
$300,000 (20%)
Budget range
$1,650,000 – $1,800,000

Typical planning ranges that follow the AACE estimate-class idea: less design, more contingency. Set the final figure from a risk review of your own project.

Weather severity and duration

Heating degree days and the count of weather days in the planned window set the size of the temporary heat and schedule float allowances. A crew that loses days to wind chill or snow does not lose the cost; it moves the cost into overtime and extended general conditions. Division 31 Earthwork is the first place severity shows up, because frozen ground and frost depth drive excavation method and backfill selection. Pull the local degree-day record and the building department's frost depth reference before you fix the float.

Fuel and energy prices for temporary heat

Temporary heat is priced as MBH demand times a fuel unit price, and the fuel price is the input that moves most between estimate and construction. Propane and direct-fired heater costs also carry delivery, tank rental, and monitoring labor, which belong on their own lines rather than folded into the fuel rate. Estimate the demand from the enclosure volume and the target curing or work temperature, then apply the current fuel price and state the source date. Our breakdown of jobsite overhead and temporary utilities covers that side of the budget in more detail.

Labor availability and overtime

The overtime share is the difference between a 5-day and a 6-day week, and it is priced at the premium rate on the affected hours only. Cold-weather trades are thinner in number, so the risk is not just premium pay but the productivity factor applied to every hour in the window. Apply the factor to the labor portion of the base estimate and show it as a separate line; that keeps the premium visible when the owner asks why the winter number is higher. The guide to how contingency allowances are sized and drawn down explains how that line sits next to, not inside, the contingency range.

How to Build a Traceable Winter Budget with KNR

A traceable winter budget starts with a quantity takeoff, not a percentage adder. We measure each winter exposure as a quantity with a unit: cubic yards of concrete placed under an enclosure, square feet of thermal blanket, gallons of propane per heater-day, tons of snow hauled off site. Each quantity carries a unit rate built from labor hours and material prices, and each rate carries a source you can check. That structure is what separates a defensible winter construction costs line from a lump sum nobody can audit.

Cold weather construction cost factors land in specific CSI MasterFormat divisions. Temporary heat and enclosures sit in Division 01 general requirements, ground thawing and frost removal in Division 31 earthwork, cold-weather concrete protection and curing in Division 03, and the permanent envelope work in Division 07 thermal and moisture protection. Keeping the winter protection items in their own cost codes lets you strip them out for a summer bid and see exactly what the season added.

Winter cost codes, units and the public source behind each rate
Cost codeLine itemUnit of measureRate driverPublic source
01 50 00Temporary heat, propane-firedHeater-dayFuel price, heater outputPPI, fuel series
01 56 00Temporary enclosures and weather wallsSquare footPanel material, labor hoursPPI, lumber and wood products
31 11 00Ground thawing and frost removalCubic yardEquipment hours, disposalBLS wage, laborers
31 23 16Snow removal and haul-offTon hauledTruck hours, tipping feeBLS wage, laborers
03 30 00Cold weather concrete placementCubic yardReady-mix, blankets, curing hoursPPI ready-mix; BLS cement masons
03 30 00Accelerator or antifreeze admixtureGallon or dose per cubic yardAdmixture price, batch quantitySupplier quote, indexed
07 21 00Insulation thickness upgradeSquare foot at stated R-valueBoard thickness, labor hoursPPI; BLS carpenters
01 00 00Weather days and standbyDayCrew size, wage, overtime premiumBLS wage, supervisors

Linking takeoffs to public PPI and wage data

Every material rate on our sheet is indexed to a published series. Lumber and wood products, ready-mix concrete, steel mill products and copper wire and cable each move on their own Producer Price Index track, and the page charts show the current 12-month changes. When steel or copper is running hot, the reinforcing and conduit lines in a winter package move with it; ready-mix moves more slowly, which matters because cold weather concrete costs are driven more by protection labor than by the mud itself.

Labor rates come from BLS occupational wage data by trade: cement masons and concrete finishers, carpenters, electricians, laborers and first-line supervisors. We apply the wage to the estimated hours, then adjust for the productivity loss the weather causes, so the overtime premium and the standby time sit on their own lines rather than hiding inside a trade's average rate. If you want the same treatment on the base building scope, our team can produce commercial takeoffs priced line by line on the identical basis.

Running winter scenarios side by side

A winter budget is rarely one number. You compare a November start against a March start, and each scenario changes the enclosure area, the heater-days, the snow removal frequency and the schedule float available before the weather turns. We build those scenarios as parallel columns in one workbook so the owner can see the delta between them line by line, with a stated AACE estimate class and a contingency that matches the design maturity.

Envelope scope deserves its own pass, because insulation thickness, R-value and air barrier continuity decide how much temporary heat the building needs once it is closed in. Our thermal and moisture scope takeoffs follow the same unit-and-rule format, and for early-stage comparisons we can run pre-drawing budget sets before drawings are complete. Send the plans through send your plans and the fee is quoted per project after review.

Frequently Asked Questions

How much does winter construction add to a commercial project budget?

There is no fixed percentage. Winter construction costs are built line by line: temporary heat and enclosure, ground thawing, concrete curing protection, snow removal, weather days, and lower labor productivity. We take off each quantity, apply a unit price and measurement rule, and show the arithmetic, so the winter adder is a traceable subtotal rather than a blanket markup.

What are the biggest cost drivers for cold-weather concrete work?

Curing protection dominates: heated enclosures, insulating blankets, accelerators or antifreeze admixtures, and the labor to monitor concrete temperature until it reaches the specified strength. Ground thawing and heated mix water add more. Each item lands in CSI Division 03 Concrete as its own line with a unit, so you can see how much of the cold-weather concrete cost is protection versus placement.

How do you estimate temporary heating costs for a winter build?

Estimate fuel use from the heated volume, the indoor-to-outdoor temperature difference, the enclosure's R-value, and the heater's rated output and efficiency, then price fuel at current rates and add heater rental, distribution, and monitoring labor. Degree days from local weather records set the operating hours. The result is a cost code with a stated assumption, not a lump sum.

What insulation R-values are required for cold-climate commercial buildings?

The requirement comes from the energy code edition your building department enforces, typically IECC or ASHRAE 90.1, which sets minimum R-values by climate zone and assembly. Confirm the adopted edition locally. Our insulation cost estimating cold climates work takes off thickness by assembly, then prices area, vapor barrier, and air barrier separately in CSI Division 07 Thermal and Moisture Protection.

How does winter weather affect labor productivity in construction estimating?

Cold, wind chill, and short daylight reduce output for exterior trades, and heated enclosure work adds setup and teardown hours. We apply a stated productivity factor to the labor hours on affected activities rather than marking up the whole estimate. The factor, the affected cost codes, and the basis are shown in the workbook so a reviewer can challenge them.

What contingency percentage should I add for winter construction costs?

The percentage follows the estimate class and the weather risk you carry, not a house rule. AACE estimate classes set the expected accuracy range; a winter schedule with limited float justifies more. We show contingency as a separate line tied to identified risks such as weather days and ground thawing, so you can adjust it without rewriting the base estimate.

Can you sign an NDA before I send drawings?

Yes. Clients can request an NDA before sending drawings, and the terms are agreed before plan review begins. Send the request with your project details and we will confirm the arrangement before any documents are transferred.

Can you use my estimate template?

Send the template along with the plans and we will confirm whether the estimate can be delivered in it. If the template's cost codes or units conflict with our takeoff structure, we will say so before the quote, so the deliverable matches what your team reviews.

Send plans for a traceable winter budget

Send your drawings, the project location, and the winter schedule window, and we will review the plans and quote the fee per project. Every winter adder comes back in an Excel workbook and PDF summary with units, arithmetic, and public data sources shown.